 * [[CLIO/Tasks/CoilBobbin|コイルボビン]] (担当:内山) 75% done @ 2009/06/15 / due: 2009/09/End
 * [[CLIO/Tasks/EndLight|エンド光]] (担当:三代木) 50% done @ 2009/06/15 due: 2009/06/End
 * [[CLIO/Tasks/DigitalControl|デジタル化 (担当:宮川) 1st phase due: 2009/7/End]]
 * [[CLIO/Tasks/Damping|ダンピング (担当:内山)]]
 * [[CLIO/Tasks/AlWireQ|純アルミ線Q値測定 (担当:鈴木(敏))]]
 * [[CLIO/Tasks/DigitalControl/AnalogFrontEnd2|デジタル化アナログフロントエンド・第2段]] (担当:辰巳)
 * RF intensity noise investigation (担当:我妻)
 * BS pendulum modification (担当:三代木) start:2009/06
 * ST pendulum modification (担当:三代木) start:2009/06
 * [[CLIO/Tasks/TargetBoard/|ターゲット板]]
|| '''Task Name''' || '''Responsible'''   || '''STATUS''' || '''due''' ||
|| [[CLIO/Tasks/AlWireQ|純アルミ線Q値測定]] || 鈴木敏 || 20% || 2009/09/End ||
|| [[CLIO/Tasks/Target|ターゲット板]] || 宮川 || 10% || 2009/08/End ||
|| [[CLIO/Tasks/Damping|ダンピング]] || 内山 || 50% LSPI by Telada || 2009/09/End ||
|| [[CLIO/Tasks/DigitalControl/AnalogFrontEnd2|デジタル化アナログフロントエンド・第2段]] || 辰巳 || 10% || 2009/07/End ||
|| RF intensity noise investigation || 我妻 || || ||
|| BS pendulum modification || 三代木 || Under Design || ||
|| ST pendulum modification || 三代木 || Parts Ordered || ||
|| [[CLIO/Tasks/DigitalControl|デジタル化 1st phase]] || 宮川 || 50% shopping + shipping || 2009/09/End ||
|| [[CLIO/Tasks/CoilBobbin|コイルボビン]] || 内山 || 75% @ 2009/06/15 || 2009/09/End ||
|| [[CLIO/Tasks/EndLight|エンド光]] || 三代木 || 90% Inline End was done @ 2009/06/15 || 2009/06/End ||
Line 23: Line 24:
 * [[CLIO/Plans/RecoilMass|リコイル・マス (担当:寺田)]]
 *
MC WFS and beam orientation control (担当:我妻)
 *
Arm cavity WFS or dithering (担当:我妻) 優先度:高Dithering 相当のシステムを早急に構築する必要あり。
 *
Main suspension Y-stage installation (担当:内山)
 *
[[CLIO/Plans/CoilDriver|アクチュエイター雑音低減・第2段(担当:辰巳) コイルアクチュエイター効率の低減]]
 *
Up-conversion noise investigation (担当:新井)
 *
Shadow sensor (担当:辰巳、高橋)
|| '''Task Name''' || '''Responsible'''   || '''COMMENTS''' ||
||
[[CLIO/Tasks/RecoilMass|リコイル・マス]] || 寺田     || ||
||
MC WFS and beam orientation control   || 我妻     || ||
||
Arm cavity WFS or dithering           || 我妻     || 優先度:高 Dithering 相当のシステムを早急に構築する必要あり。 ||
||
Main suspension Y-stage installation  || 内山     || ||
||
[[CLIO/Tasks/CoilDriver|アクチュエイター雑音低減・第2段]] || 辰巳 || コイルアクチュエイター効率の低減 ||
||
Up-conversion noise investigation     || 新井     || ||
||
Shadow sensor                         || 辰巳、高橋 || ||
Line 32: Line 34:
 * [[CLIO/Plans/DigitalControl/AnalogFrontEnd|デジタル化アナログフロントエンド・第1段]](担当:辰巳) due: 2009/3/End
 * [[CLIO/Plans/CoilDriver|アクチュエイター雑音低減・第1段]] (担当:辰巳) due: 2009/3/End
 * [[CLIO/Plans/BeamCenter|粗調ビームセンターリング]] (担当:新井) design due: 2009/1/8, deliver due 2009/1/End, preparation ends 2009/2/6
|| '''Task Name''' || '''Responsible'''   || '''STATUS''' || '''due''' ||
||
[[CLIO/Tasks/DigitalControl/AnalogFrontEnd|デジタル化アナログフロントエンド・第1段]] || 辰巳 || Done || 2009/03/End ||
|| [[CLIO/Tasks/CoilDriver|アクチュエイター雑音低減・第1段]] || 辰巳 || not yet installed || 2009/03/End ||
|| [[CLIO/Tasks/Done/BeamCenterJig|粗調ビームセンターリング]] || 新井 || design due: 2009/01/08, deliver due 2009/01/End, preparation ends 2009/02/06 || 2009/03/End ||

Period

  • April 2009 - June 2009

Top-priority

  • 低温での常温感度再現
  • 低温時 noise budget 作成作業業

Small Tasks & Schedules

Task Name

Responsible  

STATUS

due

純アルミ線Q値測定

鈴木敏

20%

2009/09/End

ターゲット板

宮川

10%

2009/08/End

ダンピング

内山

50% LSPI by Telada

2009/09/End

デジタル化アナログフロントエンド・第2段

辰巳

10%

2009/07/End

RF intensity noise investigation

我妻

BS pendulum modification

三代木

Under Design

ST pendulum modification

三代木

Parts Ordered

デジタル化 1st phase

宮川

50% shopping + shipping

2009/09/End

コイルボビン

内山

75% @ 2009/06/15

2009/09/End

エンド光

三代木

90% Inline End was done @ 2009/06/15

2009/06/End

Pending Tasks

Task Name

Responsible  

COMMENTS

リコイル・マス

寺田

MC WFS and beam orientation control

我妻

Arm cavity WFS or dithering

我妻

優先度:高 Dithering 相当のシステムを早急に構築する必要あり。

Main suspension Y-stage installation

内山

アクチュエイター雑音低減・第2段

辰巳

コイルアクチュエイター効率の低減

Up-conversion noise investigation

新井

Shadow sensor

辰巳、高橋

Past small Tasks

Task Name

Responsible  

STATUS

due

デジタル化アナログフロントエンド・第1段

辰巳

Done

2009/03/End

アクチュエイター雑音低減・第1段

辰巳

not yet installed

2009/03/End

粗調ビームセンターリング

新井

design due: 2009/01/08, deliver due 2009/01/End, preparation ends 2009/02/06

2009/03/End