2019/5/20(Mon.)

Schedule

  • 5/14: RT PC maintenance -> go to safe mode for all VIS connected Dolphin (BS, )

  • 5/17~ increasing ETMY temperature.
  • 5/20-24: Exchanging cryo valves.
  • Center
  • ITMX:
  • Xend
    • 5/2: Cooling start

    • 5/29: Cooling done
  • Yend
  • End of April~: Y arm commissioning
  • ~End of May: Y arm and FPMI commissioning

Note

Night work

Weekend

Report of work

  • Dew was found at ITMY, ETMY and ETMX.
  • COM: Finnesse was ~28 on Thursday.
    • Friday, after increasing temperature, finesse increased to ~120 with 30K.
    • Sunday, temperature increased to 50K and the finesse was 140, not drastic improvement.
  • PRM will turn off COACH filter on PSL for 10 min to measure acoustic back ground.
  • Type B: To improve Shield for SR2 oplev
  • Only ETMY temperature is increasing.
  • DAQ is not stable. All connection was lost yesterday and this morning.

Work plan

  • IOO: It takes some time for checking MZ this morning, or afternoon if needed.
  • Position of ITMX using auto leveler this afternoon or tomorrow depending work of MZ above.
  • CRY: Exchanging cryo valve during this week.

KAGRA/Commissioning/DailyWork/2019-05-20 (last edited 2019-05-21 08:58:56 by OsamuMiyakawa)