Differences between revisions 8 and 13 (spanning 5 versions)
Revision 8 as of 2018-05-01 22:57:32
Size: 624
Comment:
Revision 13 as of 2018-06-26 10:55:35
Size: 1035
Comment:
Deletions are marked like this. Additions are marked like this.
Line 9: Line 9:
||K1:GRD-PSL_STATE_N ||MICH lock status by GUARDIAN || ||K1:GRD-LSC_MICH_STATE_N ||MICH lock status by GUARDIAN ||
Line 12: Line 12:
||Channel Name ||Apr 28, 09:00- 2018 ||
||K1:LSC-MICH_IN1_DQ || error signal of MICH control ||
||K1:LS-MICH2_OUT_DQ || controls signal of MICH control ||
|| Channel Name           || Apr 28, 09:00- 2018                ||
|| K1:LSC-MICH_IN1_DQ     || error signal of MICH control       ||
|| K1:LSC-MICH1_OUT_DQ     || controls signal of MICH control    ||
|| K1:LSC-REFLAIR_B_LF_DQ || DC signal of PD at REFLection port ||
Line 18: Line 19:
||K1:GRD-PSL_STATE_N ||e || ||K1:CAL-CS_PROC_C00_STRAIN_DQ || h-of-t reconstruction 1/c v_err + A v_ctrl ||
||K1:CAL-CS_PROC_ERR_STRAIN_DQ || h-of-t reconstruction from error signal ||
||K1:CAL-CS_PROC_CTRL_STRAIN_DQ || h-of-t reconstruction from control signal ||

=== Channel summary ===
 [[attachment:bKAGRA_phase1_channel.pdf|横澤memo]]

Important Channels for bKAGRA Phase 1

Here is a list of important channels for bKAGRA phase1 Test Run. Time is given in JST. Units are in counts if not specified.

Important settings to remember

Channel Name

Apr 28, 09:00- 2018

K1:GRD-LSC_MICH_STATE_N

MICH lock status by GUARDIAN

Channel Name

Apr 28, 09:00- 2018

K1:LSC-MICH_IN1_DQ

error signal of MICH control

K1:LSC-MICH1_OUT_DQ

controls signal of MICH control

K1:LSC-REFLAIR_B_LF_DQ

DC signal of PD at REFLection port

Channel Name

Apr 28, 09:00- 2018

K1:CAL-CS_PROC_C00_STRAIN_DQ

h-of-t reconstruction 1/c v_err + A v_ctrl

K1:CAL-CS_PROC_ERR_STRAIN_DQ

h-of-t reconstruction from error signal

K1:CAL-CS_PROC_CTRL_STRAIN_DQ

h-of-t reconstruction from control signal

Channel summary

KAGRA/Commissioning/Phase1/Operation/ChannelList (last edited 2018-06-26 10:55:35 by TakaakiYokozawa)