Line 18: Line 18:
  * BS IM and TM use high power coil drivers instead of low power.
  * ETMY MN, TM, and TM use high power coil drivers instead of low power.
  * ETMX MN and IM V1/2 use high power coil drivers instead of low power. From May 4 or 5, IM H1/2/3,V3 also uses high power.
Line 21: Line 24:
  * slit size ~10mm, at C chamber first, and then A chamber
Line 23: Line 27:
  * time delay, resolution ...
  * succeefully monitored the beam under cryo baffles/shields
  * Tcam update frequency ~1sec, resolution [Inoue]
  * Tcam resolution?

  * successfully monitored the beam under cryo baffles/shields
Line 34: Line 39:
 * cooling curve (details -> CRY paper)  * cooling curve (details -> CRY paper) [Hasegawa?]
  * Platform, MN, IM, TM, shields
Line 36: Line 42:
  * height change [Inoue]
  * not much info for alignment drift. O(100)urad in yaw [Izumi]
Line 53: Line 61:
 * actuation efficiency drift  * actuation efficiency drift [Yamamoto]
Line 81: Line 89:
   * ETMY takes ~2-3 hours to damp enough for locking. ETMX takes ~1 hour.
Line 88: Line 97:
  * CMRR measurement with 3-km Michelson would be difficult
  * IMC CMRR [Nakano]

Summary of Phase 1 Measurements

  • Summary of Phase 1 measurements for bKAGRA Phase 1 paper.

Basic configurations

Michelson initial alignment

  • details of slit method
  • Tcam and baffle PD performance (details-> Tcam paper)

    • Tcam update frequency ~1sec, resolution [Inoue]
    • Tcam resolution?
    • successfully monitored the beam under cryo baffles/shields

Installation accuracy

Cryogenics

  • cooling curve (details -> CRY paper) [Hasegawa?]

    • Platform, MN, IM, TM, shields
  • alignment drift, height change during the cool down

Suspension characterization

Sensitivity and stability

Seismic noise, arm length drift

Hardware injection test

  • CBC injection(2018/4/30 Night shift)
  • CW injection(2018/5/2 Night shift)