Differences between revisions 4 and 5
Revision 4 as of 2017-12-04 13:15:10
Size: 1019
Comment:
Revision 5 as of 2017-12-04 13:21:12
Size: 1316
Comment:
Deletions are marked like this. Additions are marked like this.
Line 10: Line 10:

=== Alignment ===
 * ETMYでの光確認 (2017/XX/XX, who?)
 * ETMYのアクチューエターの確認 (2017/XX/XX, who?)
 * BSのdampingの確認 (2017/XX/XX, who?)
 * ETMYのdampingの確認 (2017/XX/XX, who?)
 * ETMYからの光をセンターエリアで確認 (2017/XX/XX, who?)

Check list for ETMY vacuum 20171204

Each item should have following format;

  • item (checked date, checked person)

Once the item has been checked, it will be like:

  • item (2017/12/10, Somebody)


Alignment

  • ETMYでの光確認 (2017/XX/XX, who?)
  • ETMYのアクチューエターの確認 (2017/XX/XX, who?)
  • BSのdampingの確認 (2017/XX/XX, who?)
  • ETMYのdampingの確認 (2017/XX/XX, who?)
  • ETMYからの光をセンターエリアで確認 (2017/XX/XX, who?)

鏡板閉止

  • 鏡板取付前の変換フランジ取付 (2017/XX/XX, who?)
  • 輻射シールドのシャッター開確認 (2017/XX/XX, who?)
  • 当該部のSI取り外し確認 (2017/XX/XX, who?)
  • 鏡板取付後のビューポート取付 (2017/XX/XX, who?)
  • Oplev用の島?取付 (2017/XX/XX, who?)

EXAチェンバー周り

  • フォトディテクターの取り外し (2017/XX/XX, who?)
  • 冷却と主ビーム観測に向けたTcamのセッティング (2017/XX/XX, who?)
  • Gigiカメラの前の真空窓取り外し (2017/XX/XX, who?)
    • (Gigiかめらのポートにはメタルガスケットが入っていないため、そのまま冷却をスタートしてしまうと真空漏れを起こしミラー表面を汚してしまう。)

KAGRA/Commissioning/Phase1/Task/CheckList/20171204VacuumETMY (last edited 2018-01-30 09:32:18 by OsamuMiyakawa)