Differences between revisions 6 and 7
Revision 6 as of 2017-12-04 13:48:30
Size: 1359
Comment:
Revision 7 as of 2017-12-04 14:37:58
Size: 1465
Editor: AyakaShoda
Comment:
Deletions are marked like this. Additions are marked like this.
Line 14: Line 14:
 * BSの高さDC制御の確認 (2017/XX/XX, who?)
Line 17: Line 18:
 * ETMYの高さDC制御の確認 (2017/XX/XX, who?)

Check list for ETMY vacuum 20171204

Each item should have following format;

  • item (checked date, checked person)

Once the item has been checked, it will be like:

  • item (2017/12/10, Somebody)


Alignment

  • ETMXでの光確認 (2017/XX/XX, who?)
  • BSのdampingの確認 (2017/XX/XX, who?)
  • BSの高さDC制御の確認 (2017/XX/XX, who?)
  • ETMYでの光確認 (2017/XX/XX, who?)
  • ETMYのアクチューエターの確認 (2017/XX/XX, who?)
  • ETMYのdampingの確認 (2017/XX/XX, who?)
  • ETMYの高さDC制御の確認 (2017/XX/XX, who?)
  • ETMYからの光をセンターエリアで確認 (2017/XX/XX, who?)

鏡板閉止

  • 鏡板取付前の変換フランジ取付 (2017/XX/XX, who?)
  • 輻射シールドのシャッター開確認 (2017/XX/XX, who?)
  • 当該部のSI取り外し確認 (2017/XX/XX, who?)
  • 鏡板取付後のビューポート取付 (2017/XX/XX, who?)
  • Oplev用の島?取付 (2017/XX/XX, who?)

EXAチェンバー周り

  • フォトディテクターの取り外し (2017/XX/XX, who?)
  • 冷却と主ビーム観測に向けたTcamのセッティング (2017/XX/XX, who?)
  • Gigiカメラの前の真空窓取り外し (2017/XX/XX, who?)
    • (Gigiかめらのポートにはメタルガスケットが入っていないため、そのまま冷却をスタートしてしまうと真空漏れを起こしミラー表面を汚してしまう。)

KAGRA/Commissioning/Phase1/Task/CheckList/20171204VacuumETMY (last edited 2018-01-30 09:32:18 by OsamuMiyakawa)