Check list for vacuum test in the Center area

  • Term: 2018/3/7~2018/3/23

Schedule

  • 2018/3/12-14: ducts connection
  • 2018/3/15-16: pump down
  • 2018/3/19-23: leak check


Check items

Each item should have following format;

  • item (checking date, checking person) -> Planned at 2018/3/XX

Once the item has been checked, it will be like:

  • item (2018/3/10, Somebody)


Alignment

  • Beam check at ETMX (2018/3/5, Enomoto)

  • Beam check at ETMY (2018/3/6, Enomoto)

  • Beam check at REFL (2018/3/6, Enomoto)

  • PD movement from BS are to REFL area (2018/3/7, Enomoto)

Preparation of monitors during pump down

  • Oplev monitor check for PRM (2018/3/XX Enomoto) -> Planned at 2018/3/XX

  • Oplev monitor check for PR2 (2018/3/XX Enomoto) -> Planned at 2018/3/XX

  • Oplev monitor check for PR3 (2018/3/XX Enomoto) -> Planned at 2018/3/XX

  • Oplev monitor check for BS (2018/3/XX Enomoto) -> Planned at 2018/3/XX

  • PD fot REFL (2018/3/XX Kokeyama) -> Planned at 2018/3/XX

  • GigE camera for IMMT1 (2018/3/7 Kokeyama)

  • GigE camera for IMMT2 (2018/3/7 Kokeyama)

  • GigE camera for PR2 (2018/3/XX Kokeyama) -> Planned at 2018/3/XX

  • GigE camera for PR3 (2018/3/8 Kokeyama)

  • Tcam for ITMX (2018/3/XX Inoue) -> Planned at 2018/3/XX

  • Vacuum gage (2018/XX/XX Uchiyama) -> Planned at 2018/3/XX

  • 真空槽の傾きをdial gaugeで測る。 (2018/3/XX Tomaru, Suzuki, Kimura) -> Planned at 2018/3/XX


Other checks before pump down

  • Re-checkin beam before pump down (2018/XX/XX Enomoto) -> Planned at 2018/3/XX

  • Monitor for gate valve open/close (2018/3/XX Uchiyama) -> Planned at 2018/3/XX

  • Star pump down(2018/XX/XX Uchiyama) -> Planned at 2018/3/19

Pump down (Kimura)

  1. 真空計 ON (2018/3/XX, Kimura)
  2. 粗挽きポンプスタート (2018/3/XX, Kimura) -> Planned at 2018/3/XX

  3. 大まかなリークチェック (2018/3/XX, Kimura) -> Planned at 2018/3/XX

  4. ターボポンプ冷却水循環装置スタート (2018/3/XX, Kimura) -> Planned at 2018/3/XX

  5. ターボポンプスタート (2018/3/XX, Kimura) -> Planned at 2018/3/XX

  6. リーク試験 (2018/3/XX, Kimura) -> Planned at 2018/3/XX

    • (リーク判定 < 1x10-10 Pa・m3/s)

Checks during pump down

  • Vacuum monitor (2018/XX/XX Uchiyama) -> Planned at 2018/3/XX

  • 真空引き後、防振系の動作チェック (2018/XX/XX Takahashi) -> Planned at 2018/3/XX


Connection status (Uchiyama)

KAGRA/Commissioning/Phase1/Task/CheckList/20180307_VacuumCenter/図2_180208_中央真空系.png

GVmc

  • hemisphere(VM7950)φ 1000/400 L 570 (2018/3/XX Uchiyama) -> Planned at 2018/3/XX

IFI

  • pump port (VL7862C) φ 800 L 1285 (2018/3/XX Uchiyama) -> Planned at 2018/3/XX

IMM

  • bellows (VL7952A) φ 400 L 555 (2018/3/XX Uchiyama) -> Planned at 2018/3/XX

PRM

  • bellows (VL7856) φ 800 L 620 (2018/3/XX Uchiyama) -> Planned at 2018/3/XX

  • pump port (VL8423) φ 800 L 760 (2018/3/XX Uchiyama) -> Planned at 2018/3/XX

  • bellows (VL7856) φ 800 L 620 (2018/3/XX Uchiyama) -> Planned at 2018/3/XX

PR3

  • bellows (VL7856) φ 800 L 620 (2018/3/XX Uchiyama) -> Planned at 2018/3/XX

  • pump port (VL8428) φ 800 L 8225 (2018/3/XX Uchiyama) -> Planned at 2018/3/XX

  • bellows (VL7856) φ 800 L 620 (2018/3/XX Uchiyama) -> Planned at 2018/3/XX

PR2

  • bellows (VL7856) φ 800 L 620 (2018/3/XX Uchiyama) -> Planned at 2018/3/XX

  • pump port (VL8425) φ 800 L 1740 (2018/3/XX Uchiyama) -> Planned at 2018/3/XX

  • bellows (VL7856) φ 800 L 620 (2018/3/XX Uchiyama) -> Planned at 2018/3/XX

BS

  • bellows (VL7855) φ 1000 L 620 (2018/3/XX Uchiyama) -> Planned at 2018/3/XX

  • pump port (VL8419) φ 1000 L 4376 (2018/3/XX Uchiyama) -> Planned at 2018/3/XX

  • bellows (VL7857D) φ 1000 L 620 (2018/3/XX Uchiyama) -> Planned at 2018/3/XX

GVbsx

BS

  • bellows/tube (VL7860) φ 1000 L 1765 (2018/3/XX Uchiyama) -> Planned at 2018/3/XX

  • pump port (VL7861) φ 1000 L 1400 (2018/3/XX Uchiyama) -> Planned at 2018/3/XX

GVbsy

BS

  • blank φ 800 (2018/3/XX Uchiyama) -> Planned at 2018/3/XX


以下、VIS,IOOに他に閉めるべきフランジがないかどうか確認してもらって作ったリスト

  • IFI, IMMの真空容器の状況
    • IFF の、プラスY側のφ400のフランジ。Oringはついてないのでつける必要がある。 (2018/3/XX Kimura) -> Planned at 2018/3/XX

    • IMMの、マイナスY側のφ400のフランジ。Oringはついてないのでつける必要がある。 (2018/3/XX Kimura) -> Planned at 2018/3/XX

  • VIS関連チャンバーの状況
    • BS:
      • トップフランジ: O-ringを入れてあるが,養生テープが貼ったまま。締められていない。 (2018/3/XX Kimura) -> Planned at 2018/3/XX

      • 上部サービスフランジ2枚(添付写真): 蓋は付いているが,締めていない。 (2018/3/XX Kimura) -> Planned at 2018/3/XX

      • フィードスルーフランジ: ガスケットは入れてあるが,ちゃんと締めていない。 (2018/3/XX Kimura) -> Planned at 2018/3/XX

      • フィードスルーフランジを取り付けるポートに付いているメクラフランジ: ちゃんと締めていない。ガスケットも入っていないかもしれない。 (2018/3/XX Kimura) -> Planned at 2018/3/XX

    • PRM:
      • トップフランジ: O-ringが入っていない。 (2018/3/7 Kimura)

      • フィードスルーフランジ: ガスケットは入れてあるが,ちゃんと締めていない。 (2018/3/7 Kimura)

      • 各側面フランジをクロークランプにより締め付ける。 (2018/3/XX Kimura) -> Planned at 2018/3/XX

    • PR2:
      • トップフランジ: O-ringは入っているが締めていない。 (2018/3/5締めた Uchiyama) -> Planned at 2018/3/XX

      • フィードスルーフランジ: ガスケットは入れてあるが,ちゃんと締めていない。 (2018/3/XX Kimura) -> Planned at 2018/3/XX

      • グリーン入射用ビューポートのフランジ: ガスケットは入れてあるが,ちゃんと締めていない。 (2018/3/XX Kimura) -> Planned at 2018/3/XX

      • PR2側面フランジのユーティリティ用フランジ(ICF203、空気導入口として使用)の交換 1箇所の締め付け (2018/3/7 Kimura)

      • 各側面フランジをクロークランプにより締め付ける。 (2018/3/XX Kimura) -> Planned at 2018/3/XX

    • PR3:
      • トップフランジ: O-ringは入っているが締めていない。(2018/3/5締めた Uchiyama) -> Planned at 2018/3/XX

      • フィードスルーフランジ: ガスケットは入れてあるが,ちゃんと締めていない。 (2018/3/XX Kimura) -> Planned at 2018/3/XX

      • 各側面フランジをクロークランプにより締め付ける。 (2018/3/XX Kimura) -> Planned at 2018/3/XX

KAGRA/Commissioning/Phase1/Task/CheckList/20180307_VacuumCenter (last edited 2018-03-14 17:10:07 by OsamuMiyakawa)