Differences between revisions 3 and 4
Revision 3 as of 2018-03-07 12:15:51
Size: 11381
Comment:
Revision 4 as of 2018-03-07 12:48:33
Size: 6123
Comment:
Deletions are marked like this. Additions are marked like this.
Line 15: Line 15:
 * item (checked date, checked person)  * item (checking date, checking person)
Line 18: Line 18:
  * --(item)-- (2017/12/10, Somebody)   * --(item)-- (2018/3/10, Somebody)
Line 23: Line 23:
 * --(ETMXでの光確認)-- (2017/12/04, 和泉)
 * --(ETMYでの光確認)-- (2017/12/12, 和泉)
 * --(BS damping to 1 urad rms)-- (2017/12/14, 和泉、長野、川崎、正田)
  * With the assumption that the Koach is off.
 * --(Find return light from ETMY at the center)-- (2017/Dec/19, Tomaru, Ushiba, Sato, Takahashi R, Izumi,)
 * --(Initialize all the optical levers)--
   * --(IMMTs 1 and 2)--
   * --(PRs 2 and 3)--
   * --(BS)-- (2017/Dec/20, Barton and Izumi)
   * --(ETMY)-- (2017/Dec/19, Ushiba, Tomaru, Izumi)
 * --(ETMYからの戻り光最終確認)-- (2018/1/18, 和泉)
 * --(Beam check at ETMX)-- (2018/3/5, Enomoto)
 * --(Beam check at ETMY)-- (2018/3/6, Enomoto)
 * --(Beam check at REFL)-- (2018/3/6, Enomoto)
 * PD movement from BS are to REFL are (2018/3/XX, Enomoto)
Line 35: Line 28:
=== 真空引き中の monitor === === Preparation of monitors during pump down ===
Line 37: Line 30:
 * --(Oplev monitorで鏡のズレを測る準備)--(2018/1/17 和泉)
 * --(Tcamで入射ビームのズレ、鏡の動きを測る準備)--(2018/XX/XX 井上)
 * --(PDバッフルで入射ビームのズレを見る準備)--(2018/1/19 都丸、牛場)
 * --(真空槽の傾きをdial gaugeで測る)--(2018/1/23 都丸、鈴木、木村)
  * --(EYVの沈み込み確認)--(2018/1/23 木村、都丸)
 * Oplev monitor check for MCI(2018/3/XX Kokeyama)
 * Oplev monitor check for MCE(2018/3/XX Kokeyama)
 * MCT(2018/3/XX Kokeyama)
 * Oplev monitor check for MCO(2018/3/XX Kokeyama)
 * Oplev monitor check for PRM(2018/3/XX Enomoto)
 * Oplev monitor check for PR2(2018/3/XX Enomoto)
 * Oplev monitor check for PR3(2018/3/XX Enomoto)
 * Oplev monitor check for BS(2018/3/XX Enomoto)

 * GigE camera for
 * Tcam for BS(2018/3/XX 井上)
 * PDで入射ビームのズレを見る準備(2018/3/XX Enomoto)
 * 真空槽の傾きをdial gaugeで測る(2018/3/XX 都丸、鈴木、木村)
Line 45: Line 46:
 * --(EQ stopの隙間のチェック5mm程度)--(2018/1/17 都丸、牛場
 * 1/26に真空引き後、防振系の動作チェック(2018/XX/XX 高橋、牛場) -> 2018/1/23予定
 * 冷却開始前にビーム再チェック(2018/XX/XX 和泉) -> 2018/1/26予定
 * アームの
ポンプスタート(2018/XX/XX 内山) -> 2018/??/??予定
 * アームの真空度のチェック(2018/XX/XX 内山) -> 2018/??/??予定
 * 真空引き開始前にビーム再チェック(2018/XX/XX Enomoto
 * 真空引き後、防振系の動作チェック(2018/XX/XX 高橋、牛場) -> 2018/1/23予定
 * ポンプスタート(2018/XX/XX 内山) -> 2018/??/??予定
 * 真空度のチェック(2018/XX/XX 内山) -> 2018/??/??予定
Line 119: Line 119:

 * 冷却開始
  i. ヘリウム圧縮機用冷却水循環装置 1次冷却水バルブ 開 (2017/XX/XX, 木村) -> 2018/1/25夕方予定
  * ヘリウム圧縮機用冷却水循環装置 ON (2017/XX/XX, 木村) -> 2018/1/25夕方予定
  * ヘリウム圧縮機 6台 ON (2017/XX/XX, 木村) -> 2018/1/25夕方予定



=== Cryo payload (都丸、牛場) ===

 * リリース関係
  * --(PFのリリース(16箇所))--(2017/12/20, 牛場、都丸)
  * --(MNのリリース(16箇所))--(2017/12/20, 牛場、都丸)
  * --(MNRのリリース(16箇所))--(2017/12/20, 牛場、都丸)
  * --(IMのリリース(6箇所))--(2017/12/20, 牛場、都丸)
  * --(IMRのリリース(16箇所))--(2017/12/20, 牛場、都丸)
  * --(TMのリリース(16箇所))--(2017/12/20, 牛場、都丸)
  * --(TMRのリリース(15箇所))--(2017/12/20, 牛場、都丸)

 * センサーチェック
  * --(TM Op''''''Lev Pitch:キャリブレーション済み)--(2017/12/08,牛場、宮本)
  * --(TM Op''''''Lev Yaw:キャリブレーション済み)--(2017/12/08,牛場、宮本)
  * TM Op''''''Lev Length:未確認 -> 真空引き以降に予定


  * --(IM PS H1:動作確認済み)--(2017/12/21,牛場、宮本)
  * --(IM PS H2:動作確認済み)--(2017/12/21,牛場、宮本)
  * --(IM PS H3:動作確認済み)--(2017/12/21,牛場、宮本)
  * --(IM PS V1:動作確認済み)--(2017/12/21,牛場、宮本)
  * --(IM PS V2:動作確認済み)--(2017/12/21,牛場、宮本)
  * --(IM PS V3:動作確認済み)--(2017/12/21,牛場、宮本)

  * --(MN PS H1:動作確認済み)--(2017/12/21,牛場、宮本)
  * --(MN PS H2:動作確認済み)--(2017/12/21,牛場、宮本)
  * --(MN PS H3:動作確認済み)--(2017/12/21,牛場、宮本)
  * --(MN PS V1:動作確認済み)--(2017/12/21,牛場、宮本)
  * --(MN PS V2:動作確認済み)--(2017/12/21,牛場、宮本)
  * --(MN PS V3:動作確認済み)--(2017/12/21,牛場、宮本)

  * --(MN Op''''''Lev Pitch: 実装したが要確認)-- -> (2018/1/23, 牛場) -> 2018/1/17予定
  * --(MN Op''''''Lev Yaw: 実装したが要確認)-- -> (2018/1/23, 牛場) -> 2018/1/17予定

  * --(温度計A:接続確認済み)--(2017/12/21,牛場)
  * --(温度計C:接続確認済み)--(2017/12/21,牛場)
  * --(温度計D:接続確認済み)--(2017/12/21,牛場)
  * --(温度計E:接続確認済み)--(2017/12/21,牛場)
  * --(温度計F:接続確認済み)--(2017/12/21,牛場)
  * 温度計G:出力不良、真空槽外配線が原因 (2018/1/XX,牛場、宮本) -> 原因はある程度特定できたがまだ未解決
  * --(温度計H:接続確認済み)--(2017/12/21,牛場)


 * アクチュエータチェック
  * --(TM アクチュエータ H1:動作確認済み)--(2017/12/11,牛場、宮本、長谷川、田中)
  * --(TM アクチュエータ H2:動作確認済み)--(2017/12/11,牛場、宮本、長谷川、田中)
  * --(TM アクチュエータ H3:動作確認済み)--(2017/12/11,牛場、宮本、長谷川、田中)
  * --(TM アクチュエータ H4:動作確認済み)--(2017/12/11,牛場、宮本、長谷川、田中)

  * --(IM アクチュエータ H1:動作確認済み)--(2017/12/15,牛場、宮本、長谷川)
  * --(IM アクチュエータ H2:動作確認済み)--(2017/12/15,牛場、宮本、長谷川)
  * --(IM アクチュエータ H3:動作確認済み)--(2017/12/15,牛場、宮本、長谷川)
  * --(IM アクチュエータ V1:動作確認済み)--(2017/12/15,牛場、宮本、長谷川)
  * --(IM アクチュエータ V2:動作確認済み)--(2017/12/15,牛場、宮本、長谷川)
  * --(IM アクチュエータ V3:動作確認済み)--(2017/12/15,牛場、宮本、長谷川)

  * --(MN アクチュエータ H1:動作確認済み)--(2017/12/15,牛場、宮本、長谷川)
  * --(MN アクチュエータ H2:動作確認済み)--(2017/12/15,牛場、宮本、長谷川)
  * --(MN アクチュエータ H3:動作確認済み)--(2017/12/15,牛場、宮本、長谷川)
  * --(MN アクチュエータ V1:動作確認済み)--(2017/12/15,牛場、宮本、長谷川)
  * --(MN アクチュエータ V2:動作確認済み)--(2017/12/15,牛場、宮本、長谷川)
  * --(MN アクチュエータ V3:動作確認済み)--(2017/12/15,牛場、宮本、長谷川)

  * --(SBS ダンピングコイル(V1-V4):接続確認済み)--(2017/12/??,牛場)

  * --(MN moving mass1:動作確認済み)--(2017/12/15,牛場、都丸)
  * --(MN moving mass2:動作確認済み)--(2017/12/15,牛場、都丸)
  * --(PF moving mass1:動作確認済み)--(2017/12/15,牛場、都丸)
  * --(PF moving mass2:動作確認済み)--(2017/12/15,牛場、都丸)

 * ダンピング制御
  * --(MN, BFを用いたヒエラリカル制御 (TMのみなどではアクチュエータレンジ不足))-- (2018/1/14,牛場)

Check list for vacuum test in the Center area

  • term: 2018/3/7~ 2018/3/23

Schedule

  • 2018/3/12-17: ducts connection
  • 2018/3/12-16: pump down and leak check


Check items

Each item should have following format;

  • item (checking date, checking person)

Once the item has been checked, it will be like:

  • item (2018/3/10, Somebody)


Alignment

  • Beam check at ETMX (2018/3/5, Enomoto)

  • Beam check at ETMY (2018/3/6, Enomoto)

  • Beam check at REFL (2018/3/6, Enomoto)

  • PD movement from BS are to REFL are (2018/3/XX, Enomoto)

Preparation of monitors during pump down

  • Oplev monitor check for MCI(2018/3/XX Kokeyama)
  • Oplev monitor check for MCE(2018/3/XX Kokeyama)
  • MCT(2018/3/XX Kokeyama)
  • Oplev monitor check for MCO(2018/3/XX Kokeyama)
  • Oplev monitor check for PRM(2018/3/XX Enomoto)
  • Oplev monitor check for PR2(2018/3/XX Enomoto)
  • Oplev monitor check for PR3(2018/3/XX Enomoto)
  • Oplev monitor check for BS(2018/3/XX Enomoto)
  • GigE camera for
  • Tcam for BS(2018/3/XX 井上)
  • PDで入射ビームのズレを見る準備(2018/3/XX Enomoto)
  • 真空槽の傾きをdial gaugeで測る(2018/3/XX 都丸、鈴木、木村)

その他追加項目

  • 真空引き開始前にビーム再チェック(2018/XX/XX Enomoto)
  • 真空引き後、防振系の動作チェック(2018/XX/XX 高橋、牛場) -> 2018/1/23予定

  • ポンプスタート(2018/XX/XX 内山) -> 2018/??/??予定

  • 真空度のチェック(2018/XX/XX 内山) -> 2018/??/??予定

  • ゲードバルブの動作チェック(2018/XX/XX 内山) -> 2018/??/??予定

  • ゲードバルブの開閉モニター (2018/XX/XX 内山) -> 2018/??/??予定

Type-A tower (高橋)

  • BFのチューニング(11/28, 高橋)

  • F3のチューニング(11/30, 高橋・奥富)

  • TFのチューニング(12/7, 高橋)

  • BF damperの位置調整(12/7, 高橋)

  • IPのセンタリング(12/7, 高橋)

  • BF FRの動作確認(12/8, 高橋・奥富)

  • BF yaw picomotorの動作確認(高橋・佐藤)

  • トップ真空槽蓋閉め(12/21, 高橋・佐藤)

  • トップ真空槽ボルト閉め(12/22, 木村)

  • クロス菅ボルト閉め(12/22, 木村)->

  • IPのDC調整 (高橋)

  • BFのdamping制御 -> (1/13, 牛場)

  • BF FRによるmirrorの高さ調整(12/21, 高橋)

  • BF yaw picomotorによるmirrorのyaw調整(12/20, 高橋)

  • 事前にTypeA、Cryopayloadのアラインメント機構が動くかどうか確認する。

  • BF温度計つなぎこみ(2018/1/24 高橋、牛場)

鏡板閉止 (木村)

  • 鏡板取付前の変換フランジ取付 (2017/12/18, 木村)

  • 輻射シールドのシャッター開確認 (2017/12/19, 木村)

  • 当該部のSuper Insulation(SI)取り外し確認 (2018/1/23, 木村)

  • 鏡板取付後のビューポート取付 (2017/12/27, 阿久津)

  • Oplev用の島?取付 (2017/12/27, 阿久津)

EYAチェンバー周り (井上)

  • フォトディテクターの取り外し (2017/12/15, 横澤)

  • 冷却と主ビーム観測に向けたTcamのセッティング (2017/12/27, 井上, 横澤)

  • Gigeカメラの前の真空窓取り外しと取り付け (2017/12/18, 井上)

    • (Gigeカメラのポートにはメタルガスケットが入っていないため、そのまま冷却をスタートしてしまうと真空漏れを起こしミラー表面を汚してしまう。)

EYV支持構造体のセット確認

  1. コーンベローズ用 3箇所 (2018/X/XX, 木村)
  2. チェンバー本体用 3箇所 <- 真空引き前にフリーにする  (2018/X/XX, 木村)

真空引き開始前後から冷却開始まで (木村)

  1. 真空フランジを開放し、再度閉止した箇所の確認(リーク試験箇所の確定に必要な情報です。)
    • グループ毎の申告による
      • EYV top flange : VIS group (2018/1/24, 高橋)

      • EYAカメラ側鏡板閉止 (2018/1/22, 木村)

      • EYV chamber : CRY group (2017/12/22, 木村+双葉工業)

      • クロス菅鏡板2箇所 : CRY group (2018/1/22, 高橋(ICRR)+双葉工業)

      • ICF253送風機接続ポート: CRY group (2018/1/22, 高橋(ICRR)+双葉工業)

      • φ800サイドフランジ: CRY group (2018/1/23, 都丸+双葉工業)

      • 冷凍機NW-50フランジ交換 4箇所: CRY group (2018/1/23, 木村)

  2. 温度・圧縮機のモニター
    • スタートさせる (2018/XX/XX, 都丸、麻生) -> 2018/1/23予定

    • 温度・圧縮機のループテスト (2018/XX/XX, 都丸、麻生、木村) -> 冷却開始前までに予定

      • 万が一遅れても冷却は遅らせない。ただし、一台すでに壊しているので、注意。
  3. 真空引き
    1. 真空計2台 ON (2018/1/23, 木村)

    2. 粗挽きポンプスタート (2018/1/24, 木村) -> 2018/1/23朝予定

    3. 大まかなリークチェック (2018/1/24, 木村) 1/23に0.1気圧引いてそれが1/24朝まで保たれていたのでOK

    4. ターボポンプ冷却水循環装置スタート (2018/1/23, 木村)

    5. ターボポンプスタート (2018/1/24, 木村) 朝9時30分起動

  4. リーク試験 (2017/XX/XX, 木村、上田、高橋(icrr)) -> 2018/1/29,30予定

    • (リーク判定 < 1x10-10 Pa・m3/s)

    • EYA arm側ゲートバルブ動作チェック (2018/XX/XX, 木村) -> 2018/1/30夕予定?

    • EYA arm側ゲートバルブOPEN (2018/XX/XX, 木村) -> 2018/1/30夕予定?

    • メインレーザーを使ったバッフルPDの動作確認 (2018/XX/XX, 和泉?) -> 2018/1/30夕予定?

KAGRA/Commissioning/Phase1/Task/CheckList/20180307_VacuumCenter (last edited 2018-03-14 17:10:07 by OsamuMiyakawa)