Line 5: Line 5:
 * Attendance: Miyakawa,
  * eZuce:
 * Attendance: Miyakawa, Uchiyama, Miyoki, Aso, Akutsu
  * eZuce: Izumi, Enomoto, Kimura, Suzuki, Tomaru, Ushiba, Inoue, Hirose
Line 13: Line 13:
  * 現在ビームをYエンドだけでなく、Xエンドでも見失っているので、今日真空槽内を見てチェック。Oplevではセンターの鏡はセンターを示している。
   * 真空槽を閉めても外からビームをトレースできるカメラなどの手段が必要なのでは。(宮川)
  * ダンピングループはYawのピークを何本か落とせた。
  * Heat linkの影響の計算をした。(宮本、牛場)
   * Type Aの20mHzの共振周波数がHeat linkであがる可能性の説明はつく。
  * Beam was found again at the ETMX and ETMY by alignment to IYA viewport using PR3.
   * We need absolutely beam monitor like camera, PD etc, even if all the chambers are closed.
  * Effect of Heat link to hardness of Yaw motion(Miyamoto, Ushiba)
Line 20: Line 18:

 * Alignment to REFL port
  * Scheduled after duct connection.
Line 24: Line 25:
 * Alignment to REFL port
  * Scheduled after duct connection.
Line 27: Line 26:
== 2. ETMXインストールスケジュールの確認 == == 2. Schedule of ETMX installtion ==
Line 31: Line 30:
== 3. Task or 検討事項 == == 3. Tasks or discussions ==
Line 33: Line 32:
=== BSへのフィードバックついて ===
 * 実験側
 * 解析側

=== Heat linkの影響(宮本) ===
=== Feed back to BS for MICH ===
 * Experimental side:
 * Data analysis side:
Line 40: Line 37:
 * LSC model(道村、和泉)
  * iKAGRAのままか、フルモデルに変更するか。
  * 走らせるPCによってはCALモデルを走らせる位置を変える必要があるかもしれない。
 * LSC model(Michimura, Izumi)
  * Same as iKAGRA or full model?
  * CAL model location? which PC?
Line 44: Line 41:
 * DAQ channel全体でのデータ量からくる制限 -> 各サブグループからの状況を見てDGSが検討、とりあえずPhase 1の運用が始まる以前までに決定  * Selection of storing DAQ channel -> DGS, before phase 1
  * Check the total amount.
Line 46: Line 44:
 * コントロールルームで表示すべきもの -> 担当、時期
  * レーザーのセーフティーがらみ。業者と相談か?
 * Screens at control room -> who, when?
  * Needs laser safety information.
Line 49: Line 47:
 * 重力波アラート: オンランで出てくるものがありそうなので、それをサイトに持ってこれるかもしれない。 -> 田越  * GW alert: online alert in the control room might be prepared. -> Togoshi
Line 56: Line 54:
== その他 == == Others ==
Line 58: Line 56:
 * 次回は3月13日。  * Next meeting: 3/13

Minute of KAGRA commissioning meeting


  • Date: 2018/3/6 11AM~12PM
  • Attendance: Miyakawa, Uchiyama, Miyoki, Aso, Akutsu
    • eZuce: Izumi, Enomoto, Kimura, Suzuki, Tomaru, Ushiba, Inoue, Hirose


1. Report of work of the last week and plan of work

  • Alignment, ETMY: Enomoto, Izumi
    • Beam was found again at the ETMX and ETMY by alignment to IYA viewport using PR3.
      • We need absolutely beam monitor like camera, PD etc, even if all the chambers are closed.
    • Effect of Heat link to hardness of Yaw motion(Miyamoto, Ushiba)
    • Height of the PR2 and PR3 did not change much. Beam was misaligned mainly at the MC. QPD for MC transmitted monitor was recovered and the beam was aligned according to the MC monitor.
  • Alignment to REFL port
    • Scheduled after duct connection.
  • Cryo:
    • Current temperature is ~40K. Speed of lowering temperature increased in these 3 days.

2. Schedule of ETMX installtion

  • See schedule

3. Tasks or discussions

Feed back to BS for MICH

  • Experimental side:
  • Data analysis side:
  • LSC model(Michimura, Izumi)
    • Same as iKAGRA or full model?
    • CAL model location? which PC?
  • Selection of storing DAQ channel -> DGS, before phase 1

    • Check the total amount.
  • Screens at control room -> who, when?

    • Needs laser safety information.
  • GW alert: online alert in the control room might be prepared. -> Togoshi

4. Phase2

Others

  • Next meeting: 3/13

KAGRA/Commissioning/Weekly/20180306/Minute (last edited 2018-03-06 12:11:44 by OsamuMiyakawa)