Differences between revisions 1 and 2
Revision 1 as of 2018-03-27 10:01:58
Size: 1176
Comment:
Revision 2 as of 2018-03-27 10:56:28
Size: 1229
Comment:
Deletions are marked like this. Additions are marked like this.
Line 5: Line 5:
 * Attendance: Miyakawa
  * eZuce: Kimura
 * Attendance: Miyakawa, Uchiyama, Yamamoto, Ohashi
  * eZuce: Kimura, Suzuki, Yokozawa, Inoue

Minute of KAGRA commissioning meeting


  • Date: 2018/3/27 11AM~12PM
  • Attendance: Miyakawa, Uchiyama, Yamamoto, Ohashi
    • eZuce: Kimura, Suzuki, Yokozawa, Inoue


1. Report of work of the last week and plan of work

  • Alignment, ETMY: Izumi
    • Mirror motion has been suppressed to ~2urad. Requirement is 1urad.
    • Beam is checked almost every night.
  • MIF: Izumi
    • k1bs, k1imc will be connected by Dolphin. ETMs are connected to k1imc by RFM.
  • CAL: Yamamoto, Yokozawa
    • Started using IMC as training of calibration.
      • Simple calibration will be implemented.
    • X end PD is removed at 3/27 today.

2. ETMX pump-down

  • See the schedule at the commissioning top page.

3. Operation

4. Tasks or discussions

  • Selection of full channel -> DGS Yamamoto

  • Selection of science channel -> Commissioning Izumi

  • Screens at control room
    • Sensitivity.
    • PEM.
    • Needs laser safety information.
  • GW alert: online alert in the control room might be prepared. -> Togoshi

4. Phase2

Others

  • Frequency noise can be measured by middle lock. Large intensity noise can be a problem.
  • Next meeting: 3/27

KAGRA/Commissioning/Weekly/20180327/Minute (last edited 2018-03-27 11:59:37 by OsamuMiyakawa)