Line 4: Line 4:
 * Date: 2018/4/10 11AM~12PM
 * Attendance: Uchiyama, Aso, Miyakawa, Nagano, Enomono, Yamamoto
  * eZuce: Ohashi, Miyoki, Ushiba, Yokozawa, Tegoshi, Kimura, Shoda, Kokeyama
 * Date: 2018/4/17 11AM~12PM
 * Attendance: Miyakawa, Kokeyama, Aso, Uchiyama, Miyoki, Akutsu
  * eZuce: Yamamoto, Suzuki, Shoda
Line 12: Line 12:
 * VAC:
  * Door was closed and pump down started. One large leak was found and it is being searched where it is.
Line 13: Line 16:
  * Michelson fringe could be seen yesterday!
   *
Damping of ETMs is still not enough.
  * Needs damping for ETMX.
  * Michelson fringe was seen on DC and RF, but still mirror motion is too large.
  * Needs more work for damping for both ETMs, L2P of BS.
Line 17: Line 19:
 * RT model: Yamamoto
  * BS model was splitted into 4kHz and 16kHz. No glitch was seen since then.
  * Found how to start/stop Dolphin without killing RT models connected to Dolphin.
  * Needs preparation to send signals to ETMs.
 * DGS:
  * IO chassis of k1ioo was disconnected somehow. It is being checked now.
Line 22: Line 22:
 * CAL: Yamamoto, Yokozawa
  * RT calibration model moved to using LSC.

 * DAQ
  * Recoding minute_raw of k1fw0 moved to SSD at k1tw0.

 * Door closing started. It will be done Wednesday or Thursday.
  * Frange exchange is done.
 * DAQ:
  * Recoding minute_raw of k1fw1 moved to SSD at k1tw1. All fw0,1 tw0,1 are working well without any gap on data.
Line 32: Line 26:
== 2. Emergency call list ==
 * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=8139|JGW-M1808139]]

== 3. Operation ==

 * How to request the engineering things was announced.
  * Contact Hayakawa or Ohashi for facility, Awai or Miyoki for electric power, Tomura or Miyakawa for circuits.
== 2. Operation ==
Line 46: Line 34:
== 4. Tasks or discussions == == 3. Tasks or discussions ==
Line 48: Line 36:
 * DAQ fix -> Miyakawa, Yamamoto
Line 62: Line 49:
 * Dust monitor using sapphire disk will be implemented around 4/10.
Line 67: Line 53:
 * Gardian of TYPE A must be implemented and tested.
 * Pump down meeting meeting at Fan hut: 12:30 at 4/11

Minute of KAGRA commissioning meeting


  • Date: 2018/4/17 11AM~12PM
  • Attendance: Miyakawa, Kokeyama, Aso, Uchiyama, Miyoki, Akutsu
    • eZuce: Yamamoto, Suzuki, Shoda


1. Report of work of the last week and plan of work

  • VAC:
    • Door was closed and pump down started. One large leak was found and it is being searched where it is.
  • IFO, ETMs: Enomono, Ushiba
    • Michelson fringe was seen on DC and RF, but still mirror motion is too large.
    • Needs more work for damping for both ETMs, L2P of BS.
  • DGS:
    • IO chassis of k1ioo was disconnected somehow. It is being checked now.
  • DAQ:
    • Recoding minute_raw of k1fw1 moved to SSD at k1tw1. All fw0,1 tw0,1 are working well without any gap on data.

2. Operation

  • Noise injection needs some preparations for speakers.
  • Schnupp asymmetry need some preparations.
  • Other plan seems to be ready.
  • CBC will perform an online analysis.

3. Tasks or discussions

  • Selection of full channel -> DGS Yamamoto

  • Selection of science channel -> Commissioning Izumi

  • Screens at control room
    • Sensitivity.
    • PEM.
    • Needs laser safety information.
  • GW alert: online alert in the control room might be prepared. -> Togoshi

Others

  • Phase 1 summarize should talk wide range view.
    • Type A has double stable point.
    • Monitor for water level, and vacuum gage for weekend should be implemented.
    • Patrol light should be implemented soon, even manual one.
  • Next meeting: 4/10

KAGRA/Commissioning/Weekly/20180417/Minute (last edited 2018-04-17 11:19:38 by OsamuMiyakawa)