Line 21: Line 21:
  * X arm item list and schedule   * X arm
Line 24: Line 24:
   * Schedule for commissioning    * Schedule for commissioning.
  * ITMX
   * Status.
  * ETMX
   * measurement for room temp. ~6/14, Cooled ~August
   * How much angle fluctuation is acceptable?
Line 26: Line 31:
== 3. mailing list ==

== 4. Meeting ==
Line 29: Line 37:
 * Next meeting: 5/15.  * Next meeting: 5/29.

Minute of KAGRA commissioning meeting


  • Date: 2018/5/22 11AM~12PM
  • Attendance: Miyakawa,
    • eZuce: Hirose, Izumi, Ushiba


  • 5/28 10AM~ Extended chief meeting at Toyama Univ.

1. Stages in phase 2

2. Phase 2

  • What we need;
    • IOO
      • Schedule
      • Human resources
    • X arm
      • Item list, what is prepwhen, who
      • Schedule for preparation.
      • Schedule for commissioning.
    • ITMX
      • Status.
    • ETMX
      • measurement for room temp. ~6/14, Cooled ~August
      • How much angle fluctuation is acceptable?

3. mailing list

4. Meeting

Others

  • Next meeting: 5/29.