Line 21: | Line 21: |
* X arm item list and schedule | * X arm |
Line 24: | Line 24: |
* Schedule for commissioning | * Schedule for commissioning. * ITMX * Status. * ETMX * measurement for room temp. ~6/14, Cooled ~August * How much angle fluctuation is acceptable? |
Line 26: | Line 31: |
== 3. mailing list == == 4. Meeting == |
|
Line 29: | Line 37: |
* Next meeting: 5/15. | * Next meeting: 5/29. |
Minute of KAGRA commissioning meeting
- Date: 2018/5/22 11AM~12PM
- Attendance: Miyakawa,
- eZuce: Hirose, Izumi, Ushiba
- 5/28 10AM~ Extended chief meeting at Toyama Univ.
1. Stages in phase 2
2. Phase 2
- What we need;
- IOO
- Schedule
- Human resources
- X arm
- Item list, what is prepwhen, who
- Schedule for preparation.
- Schedule for commissioning.
- ITMX
- Status.
- ETMX
- measurement for room temp. ~6/14, Cooled ~August
- How much angle fluctuation is acceptable?
- IOO
3. mailing list
4. Meeting
Others
- Next meeting: 5/29.