Line 5: Line 5:
 * Attendance: Miyakawa, Uchiyama, Aso, Yamamoto, Yokozawa, Enomoto, Stefan
  * eZuce: Izumi, Nakano, Inoue, Yamamoto(Toyama), Suzuki, Miyoki, Ushiba, Eleonora, Shoda, Tegoshi
 * Attendance: Miyakawa, Aso, Yamamoto, Tomura, Enomoto
  * eZuce: Izumi, Inoue, Yamamoto(Toyama), Suzuki, Miyoki, Yokozawa, Ohashi, Izumi, Nakano, Stefan
Line 13: Line 13:
== ETMX status ==
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=5224]]
  * ring on f0 got lower and on the f1 by a few mm.
  * f0 TF had no response. Line to coil was cut. It had been repaired before and it was used again.
  * It will be fixed around September as 1week work. Whole coil will be replaced.

== X arm commissioning/preparation ==
 * WFS target: 10nrad.
 *

== Satellite box modification ==

 * 100nF cap will be implemented to avoid an oscillation. It introduce 41Hz pole.

Line 16: Line 31:
== ETMX status ==
Line 19: Line 34:
== X arm commissioning/preparation ==

Minute of KAGRA commissioning meeting


  • Date: 2018/6/12 11AM~12PM
  • Attendance: Miyakawa, Aso, Yamamoto, Tomura, Enomoto
    • eZuce: Izumi, Inoue, Yamamoto(Toyama), Suzuki, Miyoki, Yokozawa, Ohashi, Izumi, Nakano, Stefan


0. Schedule

  • k1ix0 will be needed by September for NAB PD.

ETMX status

  • http://klog.icrr.u-tokyo.ac.jp/osl/?r=5224

    • ring on f0 got lower and on the f1 by a few mm.
    • f0 TF had no response. Line to coil was cut. It had been repaired before and it was used again.
    • It will be fixed around September as 1week work. Whole coil will be replaced.

X arm commissioning/preparation

  • WFS target: 10nrad.

Satellite box modification

  • 100nF cap will be implemented to avoid an oscillation. It introduce 41Hz pole.

MC realignment

FSS BO

PMC installation, circuits, adding offset

IOO schedule

1. X arm commissioning

  • Do we need WFS?(Eleonora) -> Yes, with control system.(Izumi)

  • Gouy phase measurement for green is also necessary. (Akutsu)
  • Both mirrors are at the room temperature. (Uchiyama)
  • Needs preparation list. (Aso)
  • Loss measurement will performed mainly reflection light. (Izumi)
  • Simulation of loss? (Eleonora) -> Hirose, Hiro Yamamoto

  • Camera view? (Stefan) -> PCal camera, transmitted camera

  • Which port will be used for locking? (Miyakawa) -> REFL port

2. New 40 W laser

3. PMC electronic hack

  • MATSUSADA HV driver has 10uV/rHz, quite high.
  • Slow output can be used as offset, and 2nd EXC point will be used as input.
  • LIGO is not using temperature controller. (Stefan)

Others

  • Next meeting: 5/29.