== IOO schedule ==


Minute of KAGRA commissioning meeting


  • Date: 2018/6/12 11AM~12PM
  • Attendance: Miyakawa, Aso, Yamamoto, Tomura, Enomoto
    • eZuce: Izumi, Inoue, Yamamoto(Toyama), Suzuki, Miyoki, Yokozawa, Ohashi, Izumi, Stefan


0. Schedule

  • k1ix0 will be needed by September for NAB PD.

ETMX status

  • http://klog.icrr.u-tokyo.ac.jp/osl/?r=5224

    • ring on f0 got lower and on the f1 by a few mm.
    • f0 TF had no response. Line to coil was cut. It had been repaired before and it was used again.
    • It will be fixed around September as 1week work. Whole coil will be replaced.

X arm commissioning/preparation

  • WFS target: 10nrad.

Satellite box modification

MC realignment

  • MC will be re-aligned today.

FSS BO

  • BO card was broken and it was replaced.
  • BO check card is still connected between BO card and circuit to break ground loop.

PMC installation, circuits, adding offset

Others

  • Next meeting: 6/19.