Differences between revisions 3 and 4
Revision 3 as of 2018-06-19 11:35:10
Size: 2151
Comment:
Revision 4 as of 2018-06-19 11:39:43
Size: 2199
Comment:
Deletions are marked like this. Additions are marked like this.
Line 32: Line 32:
Line 36: Line 35:
  * Needs gain at low frequency in digital loop.

Minute of KAGRA commissioning meeting


  • Date: 2018/6/19 11AM~12PM
  • Attendance: Miyakawa, Aso, Yokozawa, Ohishi, Kokeyama, Miyoki, Tahara, Enomoto, Stefan, Tomura, Ushiyama, Nakano
    • eZuce: Ushiba, Izumi, Inoue, Yamamoto(Toyama), Suzuki, Hirose, Shoda


0. Schedule

  • k1ix0 will be needed by September for NAB PD.

Laser

  • Transmissivity of Faraday Isolator suddenly reduced 60% to 40%.
  • Starding Fiber amp failed due to too low power at the sensor.
  • We will use spare at Mio labs. We can use current low power laser, so schedule won't be changed so much.

IMMT

  • Changed titanium screws.
  • IMMT1 repare was done, with 1cm position accuracy.
    • 1cm is not enough(Izumi).
  • IMMT2 repare will be held 7/9~.

PMC

  • Offset was implemented.
  • Whitening will be implemented by daughter board.
    • Needs gain at low frequency in digital loop.

Useful scripts for RT-models

X arm commissioning/preparation

  • WFS target: 10nrad.

Satellite box modification

MC realignment

  • MC will be re-aligned today.

FSS BO

  • BO card was broken and it was replaced.
  • BO check card is still connected between BO card and circuit to break ground loop.

PMC installation, circuits, adding offset

Others

  • Next meeting: 6/19.

KAGRA/Commissioning/Weekly/20180619/Minute (last edited 2018-06-19 11:44:01 by OsamuMiyakawa)