Differences between revisions 2 and 3
Revision 2 as of 2018-06-25 09:04:55
Size: 340
Comment:
Revision 3 as of 2018-06-25 11:48:29
Size: 428
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:
 * FSS and PMC locked together  * Summary of PMS work by Stefan
 
* PMC servo modifications -> Stefan
   * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=5155]]

 * FSS and PMC locked together -> Nakano, Stefan
Line 5: Line 10:

 * PMC servo modifications -> Stefan
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=5155]]

 * PMC autolocking sped up
 * PMC autolocking sped up -> Stefan, Nakano
Line 12: Line 13:
 * Necessary number of High power coil driver

 * beam height
 * Necessary number of High power coil driver -> Aso
 * beam height -> Uchiyama

Topic

  • Summary of PMS work by Stefan

* PMC servo modifications -> Stefan

KAGRA/Commissioning/Weekly/20180626/Agenda (last edited 2018-06-26 10:54:58 by OsamuMiyakawa)