Differences between revisions 4 and 7 (spanning 3 versions)
Revision 4 as of 2018-06-26 11:06:43
Size: 747
Comment:
Revision 7 as of 2018-06-26 11:48:50
Size: 1277
Comment:
Deletions are marked like this. Additions are marked like this.
Line 6: Line 6:
  * eZuce: Shoda, Ushiba, Hirose, Eleonora, Izumi, Yamamoto(Toyama), Kokeyama   * eZuce: Shoda, Ushiba, Hirose, Eleonora, Izumi, Yamamoto(Toyama), Kokeyama, Miyoki
Line 11: Line 11:
  * Two PZT steering mirrors were installed yesterday for input beam to IMC.
  * Calibration to Hz will be done today.
  * Thermal drive is sill missing.
  * Needs fitness, noise budget or something.
  * Probably we do not need to change HV PZT driver by O3, but needs estimation.
Line 22: Line 27:
  * ETMX and ITMX should be located at half low temperature stage and room temperature stage. It means that ~5mm off from the nominal position. Type A can compensate ~5mm.
Line 23: Line 30:

 * Cable cleaning on BS rack will be done this weekend.

Minute of KAGRA commissioning meeting


  • Date: 2018/6/26 11AM~12PM
  • Attendance: Miyakawa, Yokozawa, Stefan, Nakano, Yamamoto
    • eZuce: Shoda, Ushiba, Hirose, Eleonora, Izumi, Yamamoto(Toyama), Kokeyama, Miyoki


PMC

Others

  • Beam height brain storming -> next week?

    • ETMX and ITMX should be located at half low temperature stage and room temperature stage. It means that ~5mm off from the nominal position. Type A can compensate ~5mm.
  • Necessary number of High power coil driver -> Aso

  • Cable cleaning on BS rack will be done this weekend.
  • Next meeting: 7/3.

KAGRA/Commissioning/Weekly/20180626/Minute (last edited 2018-06-26 11:48:50 by OsamuMiyakawa)