Differences between revisions 5 and 6
Revision 5 as of 2018-06-26 11:26:01
Size: 904
Comment:
Revision 6 as of 2018-06-26 11:35:21
Size: 1216
Comment:
Deletions are marked like this. Additions are marked like this.
Line 6: Line 6:
  * eZuce: Shoda, Ushiba, Hirose, Eleonora, Izumi, Yamamoto(Toyama), Kokeyama   * eZuce: Shoda, Ushiba, Hirose, Eleonora, Izumi, Yamamoto(Toyama), Kokeyama, Miyoki
Line 14: Line 14:
  * Needs fitness, noise budget or something.
  * Probably we do not need to change HV PZT driver by O3, but needs estimation.
Line 25: Line 27:
  * ETMX and ITMX should be located at half low temperature stage and room temperature stage. It means that ~5mm off from the nominal position. Type A can compensate ~5mm.

Minute of KAGRA commissioning meeting


  • Date: 2018/6/26 11AM~12PM
  • Attendance: Miyakawa, Yokozawa, Stefan, Nakano, Yamamoto
    • eZuce: Shoda, Ushiba, Hirose, Eleonora, Izumi, Yamamoto(Toyama), Kokeyama, Miyoki


PMC

Others

  • Beam height brain storming -> next week?

    • ETMX and ITMX should be located at half low temperature stage and room temperature stage. It means that ~5mm off from the nominal position. Type A can compensate ~5mm.
  • Necessary number of High power coil driver -> Aso

  • Next meeting: 7/3.

KAGRA/Commissioning/Weekly/20180626/Minute (last edited 2018-06-26 11:48:50 by OsamuMiyakawa)