Minute of KAGRA commissioning meeting


  • Date: 2018/6/26 11AM~12PM
  • Attendance: Miyakawa, Yokozawa, Stefan, Nakano, Yamamoto
    • eZuce: Shoda, Ushiba, Hirose, Eleonora, Izumi, Yamamoto(Toyama), Kokeyama, Miyoki


PMC

Others

  • Beam height brain storming -> next week?

    • ETMX and ITMX should be located at half low temperature stage and room temperature stage. It means that ~5mm off from the nominal position. Type A can compensate ~5mm.
  • Necessary number of High power coil driver -> Aso

  • Cable cleaning on BS rack will be done this weekend.
  • Next meeting: 7/3.