= Minute of KAGRA commissioning meeting = ---- * Date: 2018/7/24 11AM~12PM * Attendance: Miyakawa, Izumi, Ohishi * eZuce: Yamamoto, Nakano, Shoda, Suzuki ----- == LAS (Nakano) == * EOM and FI are being tested. * EOM: TF and modulation index were measured. * Fiber isolate reached and is being tested. * Installation to KAGRA started. == PSL, IOO == * MZ alignment is being proceeded, and MC has been already locked with single arm of MZ. * Mode matching ratio is still bad but it will be fixed soon. == ISS == * ISS loop locked again. OLG or RIM was measured, and they are being analyzed. == IMMT2 (Ohishi) == * On 7/9, we started take IMMT out from the chamber. * All the replacement of magnetized screws is done by the end of last week. * Mirror position (distance between mirror and coile) was shifted a ~mm, probably caused by tilt of optical. * TF will be measured soon. == ACC noise == * Old circuits are still used in TAMA era, and all the noise floor are high. == ETMX (Miyamoto) == == Geophone == * To fix BS GeoPhone, we should open the chamber. * TMS GeoPhone looks fine, but some strange coupling can be seen in the TF measurement. * Feedback bandwidth is limited ~10Hz. == DGS == * DAC is almost out of stock. We should think to start using old DAC used in CLIO. == rack cleaning == == Others == * Next meeting: 7/31.