= Minute of KAGRA commissioning meeting = ---- * Date: 2018/10/30 11AM~12PM * Attendance: Miyakawa, Oshino, Yokozawa * eZuce: Enomoto, Kokeyama, Aso, Akutsu, Miyoko, Ushiba, Uchiyama, Miyoki, Aso ----- === Schedule === * 11/5-end of Nov.: IYA root will be closed. * 11/6: AM or PM for 30min : Inspection for ETMX cleaning * 12/10 or 11: ETMX cleaning * MZ work needs stopping IR in the daytime; ~10/31 ok, 11/1~11/31? * Assignment of tuning for suspensions. ---- * X arm lock * OLTF was measured. Results of cavity pole and finesse are quite coincident with measumrements of mirrors. * ETMX * Bottom one is what we suspect that the magnet might be broken. * Spacer can be seen. * Magnet size is 2mm in diameter and 2mm in length, so it is difficult to think something hit the magnet and broken. It might be caused drastic temperature change. * Laser, PSL, IOO report * AOM driver was replaced and now AOM is working well. So, it won't change schedule. * OMC installation * They saw some resonance. Needs to fix some circuit for DCPD. * DGS * Scheduling for maintenance time on Wednesday morning. All suspensions go to the safe mode. * Picomotor driver seemed to be fixed. Needs final check with what had no response at all before. == Others == * Next meeting: 11/6.