== 2019/1/8 Commissioning meeting topics == * Assignment of staffs for night work * [[https://teamup.com/kswnmta8p18h6u1uab]] * Readiness for the X arm commissioning. * [[https://docs.google.com/spreadsheets/d/1S2gyFkyajlbPXMKCrqJV7181YFHUxUgPRB6SXz4z4jI/edit?usp=sharing]] ---- === Schedule === * 1/4 Camera moves to ETMY. * 1/6: End of X arm commissioning. * 1/7-15: Laser stop in the laboratory area. * 1/7: Removal of aluminum foil for WAB at EYC. * 1/7?: Removal of first contact of ETMY * 1/7~ : Opening chambers. * 1/7~ : High power beam dump installation. * 1/14~18 : Hight check for VIS systems. * 1/7~11 : BS tuning * 1/9? or later: EYC pumping down * beam alignment: * 1/7~: Opening IMC Chamber. * IMC beam alignment in air: 1/11-14 * IMC lock recover in vacuum: 1/16 * IMC to ETMX: 1/17-21 * BS to ETMY: 1/17-21 * ITMY to REFL: 1/21-22 * ITMY to SRM: 1/22-23 * ITMY to OMC: 1/23-25 * ITMX to OMC: 1/23-25 * POS to ETMY(Green laser): 1/23-24 * ETMY to POS(Green laser): 1/24-25 * '''1/27: end of alignment up to SRs''' * 2/18-20 EXC door close * ETMX to ITMX: 2/21-22 * Yend * 1/25-2/22: Yend Pcal finalization * 2/25-3/4: Yend WAB * 3/8~ : Yend pumpdown 3/8~ * 3/11,12: leak test * Xend * 2/22-3/10: Xend Pcal finalization * 2/11-2/22: Xend NAB installation * 3/11- Xend WAB * 3/11~ : Night work start * 2/4(no delay)-3/8 DRMI commissioning * 3/11(3weeks delay)-4/5 Y arm commissioning * 3/25(1week delay)-4/5 FPMI commissioning ---- === Discussion === * X amr commissioning summary * schedule for Y arm alignment, etc. * Modulation by Mach-Zehnder ---- * X commissioning * Some noise improvement: * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=7546]]: modulation index, whitening * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=7553]]: filsters off * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=7561]]: PR2 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=7562]]: ALS Noise Budget * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=7571]]: ALS Noise Budget * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=7499]]: Dither Alignment Control * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=7507]]: Dither Alignment Control * VIS * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=7573]]: TF of type A * Laser, PSL, IOO report * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=7572]]: MC cavity pole * AOS * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=7502]]: Beam profile measurement on the TMSX table * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=7574]]: Beam profile measurement on the TMSX table * Y arm preparation: * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=7538]]: Green beam for Y arm was coupled to the optical fiber * DGS: * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=7534]]: TYPE-A model downsampling