== 2019/5/21 15:00-16:00 Weekly commissioning meeting topics == * Zoom URL: [[https://zoom.us/j/6676627462|https://zoom.us/j/6676627462]] * Assignment of staffs * [[https://teamup.com/kswnmta8p18h6u1uab]] ---- ==== Schedule ==== * 5/14: RT PC maintenance -> go to safe mode for all VIS connected Dolphin (BS, ) * 5/20-24: Exchanging cryo valves. * 6/8: Engineering run * ITMX * 5/22AM~: tuned off cryostat cooler, finesse measurement for Xarm * ETMX * --(5/2: Cooling start)-- * 5/29: Cooling done * ITMY * 5/23AM~: tuned off cryostat cooler, finesse measurement for Yarm * ETMY * 5/17~: tuned off ETMY cryostat cooler * 5/24PM~ inject 100Pa Nitrogen. * 5/27 evacuation of Nitrogen. * 6/3-6/14: Installation of TMS for ETMY * 4/22-5/31: Yarm commissioning * 5/27-6/30: DRMI commissioning * 7/1-8/9: DRFPMI commissioning * 8/12-10/4: DRFPMI ASC * 10/7-11/15: Post Commissioning * 11/18-12/13: Noise hunting ---- === Discussion === ==== Low finesse issue on Y arm ==== * Status as of now * 2019/5/17(Thu) * X-arm: * Finesse = 1399 * Power build-up factor = 891 * Ring-down half-life = 3.11msec * REFL POWER locked/unlocked = 0.96 * Y-arm: * Finesse = 28 * Power build-up factor = 18 * Ring-down half-life = 0.42msec * REFL POWER locked/unlocked = 0.50 (agrees with experiment) * 2019/5/17(Thu) * Finesse of Yarm for green: 17 (design 50) * 2019/5/17(Fri) * Finesse of Yarm for IR: 120, ETMY temperature 33K * 2019/5/19(Sun) * Finesse of Yarm for IR: 146, ITMY temperature 25K, ETMY temperature 51K * 2019/5/20(Mon) * Finesse of Yarm for IR: 131, ITMY temperature 25K, ETMY temperature 60K * Finesse of Xarm for IR: 1151(probably due to the miscentering), ITMY temperature 29K, ETMY temperature 126K, but alignment at ETMX * Cryo status and plan * ETMY * 5/17~: tuned off ETMY cryostat cooler * 5/24PM~ inject 100Pa Nitrogen to increase temperature. It takes several days close to room temperature ?? degree. * 5/27 evacuation of Nitrogen. * ITMY * 5/23AM~: tuned off cryostat cooler, finesse measurement for Yarm * ITMX * 5/22AM~: tuned off cryostat cooler, finesse measurement for Xarm * Chance for Y arm finesse measurement: 5/21, 5/23 and after 5/29 of evacuation of Nitrogen * Searching good spot on Yarm ----