Differences between revisions 1 and 7 (spanning 6 versions)
Revision 1 as of 2019-07-23 10:54:17
Size: 322
Comment:
Revision 7 as of 2019-07-23 11:24:03
Size: 628
Comment:
Deletions are marked like this. Additions are marked like this.
Line 5: Line 5:
 * Attendance: Miyakawa, Aso, Nakano, Kozakai, Washima, Miyo, Yokozawa, Enomoto, Yamada, Stefan, Ogaki
 * Zoom: Sawada, Uchiyama, Inoue, Kokeyama, Shoda
 * Attendance: Miyakawa, Aso, Washima, Yamamoto, Oshino, Yokozawa, Kozakai, Miyo, Enomoto, Nakano, Tomura, Valera, Stefan
 * Zoom: Takahashi, Shoda, Uchiyama, Miyoki, Izumi, Yamada, Okutomi
Line 11: Line 11:
 *  * Hand off from ALS to IR next.
  * Needs transmitted light.
   * CARM to be square root of transmitted light during hand off.
  * Normalized CARM and DARM in digital should be used.

 * PRMI was locked with 3f.
 * Mode hoping exists but less now if without SRM.

Minute of KAGRA commissioning meeting


  • Date: 2019/7/23 11:00~12:00
  • Attendance: Miyakawa, Aso, Washima, Yamamoto, Oshino, Yokozawa, Kozakai, Miyo, Enomoto, Nakano, Tomura, Valera, Stefan
  • Zoom: Takahashi, Shoda, Uchiyama, Miyoki, Izumi, Yamada, Okutomi


Discussion

  • Hand off from ALS to IR next.
    • Needs transmitted light.
      • CARM to be square root of transmitted light during hand off.
    • Normalized CARM and DARM in digital should be used.
  • PRMI was locked with 3f.
  • Mode hoping exists but less now if without SRM.


Others

  • Next meeting: 7/30.

KAGRA/Commissioning/Weekly/20190723/Minute (last edited 2019-07-23 11:51:02 by OsamuMiyakawa)