Line 57: Line 57:
  * 2/28-3/6: Health check and maintenance for VIS   * 2/28-3/15: Health check and maintenance for VIS
Line 59: Line 59:
   * PRM: Misalignment does not reach where beam hits damper. -> 3/4-6
   * --(3/5
PR3: range -> incline by 20-30mrad at mirror because of bistable. -> 3/5)--
   *
BS: Yaw offset adjustment by hand. -> 3/5-6

  * Postponed: 3/2-6: Re-alignment
   * 3/4-8 PRM: Misalignment does not reach where beam hits damper.
   * --(3/
6 PR3: range -> incline by 20-30mrad at mirror because of bistable.)--
   * ~3/1
5 BS: Yaw offset adjustment by hand. -> 3/5-6
Line 65: Line 64:
  * Postponed: 3/7: Closing
  * Postponed: 3/8: pump down
  * 3/18-19: Re-alignment
  *
3/19: Closing
  * 3/20: pump down
Line 74: Line 74:
  * Postponed: Alignment to ETMX by 3/7 morning
Line 84: Line 83:
   * Beam position by IR and Green
  * 3/5 and 3/11~: ETMX seems to be hitting somewhere? Tuning was not enough(by Takahashi).
  * 3/6: ETMX aligned with oplev accuracy
  * 3/5:
AOS EY and EX(if they have time) work.
  * 3/6: Green X alignment (no IR), and no hazard at Y end.
  * 3/9
-10(fastest, then 3/23): Pcal finalization
   * --(3/6: Beam position by IR and Green)--
  * --(3/5 AOS: EY and EX(if they have time) work.)--
  * --(3/6: Green X alignment (no IR), and no hazard at Y end.)--
Line 91: Line 87:
  * ~3/15: ETMX tuning.
Line 93: Line 90:
  * 3/18,19: ETMX alignement
Line 97: Line 95:
 * 3/11~ : Night work starts, daily meeting will be moved to 1PM  * 3/18~ : Night work starts, daily meeting will be moved to 1PM
Line 100: Line 98:
 * 2/18-3/22 DRMI commissioning
 * 3/11-4/5 Y arm commissioning
 * 3/25-4/5 FPMI commissioning
 * 2/18-3/22(?postponed): DRMI commissioning
 * 3/25-4/19: Y arm commissioning
 * 3/25-4/19: FPMI commissioning

KAGRA Commissioning Wiki


Task list


Schedule


Working people assignment

Readiness for the X arm commissioning


Meetings

Daily Meetings (9AM)

Zoom URL: https://zoom.us/j/7631499341

Weekly Meetings (Tuesday 11AM)

Zoom URL: https://zoom.us/j/6676627462


Daily meeting

  • Date and time: Every weekday, 9AM
  • First ~10min in the morning meeting, as short as possible
  • Location: Control room and Fan hut connected by eZuce

2019/3/7(Thur.)

Schedule

  • Center
    • 2/26-27: Venting

    • 2/28-3/15: Health check and maintenance for VIS
      • PRM: One flag was dropped. -> leave it

      • 3/4-8 PRM: Misalignment does not reach where beam hits damper.
      • 3/6 PR3: range -> incline by 20-30mrad at mirror because of bistable.

      • ~3/15 BS: Yaw offset adjustment by hand. -> 3/5-6

    • 3/5 afternoon or 3/6 morning: Coolers for ITMs will be stopped for 2-3 hours to change water.

    • 3/18-19: Re-alignment
    • 3/19: Closing
    • 3/20: pump down
  • Yend
    • 1/25-2/20: Yend Pcal finalization

    • 3/5: EYA remaining works by Enomoto, Inoue.

    • 2/25-3/4: Yend WAB finalization

      • 3/5: AOS EY and EX(if they have time) work.

    • 3/6: Y end closing (no laser hazard at least in the morning)

    • 3/7: Y end pump down
      • 3/7,8: leak test
  • Xend
    • 2/11-2/14: Xend NAB installation

    • 2/21: Removing FC, Payload release

      • 2/27: ETMX release

    • 2/23-3/6: Xend Pcal finalization 1

      • Periscope installation

      • 3/6: Beam position by IR and Green

    • 3/5 AOS: EY and EX(if they have time) work.

    • 3/6: Green X alignment (no IR), and no hazard at Y end.

    • 3/11, 18,19: Xend WAB finalization.
    • ~3/15: ETMX tuning.
    • 3/19: Heatlink etc.
    • 3/19: ETMX finalization by Takahashi
    • 3/18,19: ETMX alignement
    • 3/21 closing
    • 3/22 Pumping down
      • Leak test
  • 3/18~ : Night work starts, daily meeting will be moved to 1PM
    • Summary of work will last for a while in the morning meeting.
  • 2/18-3/22(?postponed): DRMI commissioning
  • 3/25-4/19: Y arm commissioning
  • 3/25-4/19: FPMI commissioning

Note

Weekend

Report of work

  • Pump down for central area was postponed for 2 weeks.
  • Type B: BS still has some trouble, it was decided to open chamber again.
  • Type Bp: OSEMs were fixed, and it looks OK. Beam position on QPD was off. PRM needs more tuning and measurement. It will be done in the next week.
  • Y end temperature became low by 3 degree.
  • IOO: Found touching AOM driver and fork, and it was making a big group loop. Once it was released the noise became much smaller.

Work plan

  • Yend pump down start today.

KAGRA/Commissioning/DailyWork
<< <  2024 / 3 >  >>
Mon Tue Wed Thu Fri Sat Sun
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31


Weekly meeting

  • Date and time: Every Tuesday, 11AM
  • Location: Meeting room at Hokubukaikan, or eZuce, Polycom

No.

Date

Agenda

Schedule

Minute

Files

62

2019/3/5

Agenda

See agenda page

Minute

61

2019/2/19

Agenda

See agenda page

Minute

60

2019/2/5

Agenda

See agenda page

Minute

59

2019/1/29

Agenda

Minute

58

2019/1/22

Agenda

Minute

57

2019/1/8

Agenda

Minute

56

2018/12/25

Agenda

Minute

55

2018/12/17

Agenda

Minute

54

2018/12/11

Agenda

Minute

53

2018/12/4

Agenda

Minute

52

2018/11/27

Agenda

Minute

51

2018/11/20

Agenda

Minute

50

2018/11/13

Agenda

Minute

49

2018/11/6

Agenda

Minute

48

2018/10/30

Agenda

Minute

47

2018/10/23

Agenda

Minute

46

2018/10/16

Agenda

Minute

45

2018/10/9

Agenda

Schedule

Minute

44

2018/10/2

Agenda

Schedule

Minute

43

2018/9/18

Agenda

Schedule

Minute

42

2018/9/4

Agenda

Schedule

Minute

41

2018/8/28

Agenda

Schedule

Minute

40

2018/8/21

Agenda

Schedule

Minute

39

2018/8/7

Agenda

Schedule

Minute

38

2018/7/31

Agenda

Schedule

Minute

37

2018/7/24

Agenda

Schedule

Minute

36

2018/7/17

Agenda

Schedule

Minute

35

2018/7/3

Agenda

Schedule

Minute

34

2018/6/26

Agenda

Schedule

Minute

33

2018/6/19

Agenda

Schedule

Minute

32

2018/6/12

Agenda

Schedule

Minute

31

2018/6/5

Agenda

Schedule

Minute

30

2018/5/22

Agenda

Schedule

Minute

29

2018/5/8

Agenda

Schedule

Minute

28

2018/5/1

Agenda

Schedule

Minute

27

2018/4/17

Agenda

Schedule

Minute

26

2018/4/10

Agenda

Schedule

Minute

25

2018/4/3

Agenda

Schedule

Minute

24

2018/3/27

Agenda

Schedule

Minute

23

2018/3/20

Agenda

Schedule

Minute

22

2018/3/13

Agenda

Schedule

Minute

21

2018/3/6

Agenda

Schedule

Minute

20

2018/2/27

Agenda

Schedule

Minute

19

2018/2/20

Agenda

Schedule

Minute

18

2018/2/13

Agenda

Schedule

Minute

17

2018/2/6

Agenda

Schedule

Minute

16

2018/1/30

Agenda

Schedule

Minute

15

2018/1/23

Agenda

Schedule

Minute

14

2018/1/16

Agenda

Schedule

Minute

13

2018/1/9

Agenda

Schedule

Minute

12

2017/12/19

Agenda

Schedule

Minute

11

2017/12/12

Agenda

Schedule

Minute

10

2017/11/28

Agenda

Schedule

Minute

9

2017/11/14

Agenda

Schedule

Minute

8

2017/11/7

Agenda

Schedule

Minute

7

2017/10/31

Agenda

Minute

G1707278-v4

6

2017/10/24

Agenda

Minute

G1707278-v3

5

2017/10/17

Agenda

Minute

G1707278-v2
G1707298
G1707300

4

2017/10/10

Minute

G1707278-v1

3

2017/10/3

Agenda

Minute

Commissioning plan for phase1

2

2017/9/26

Agenda

Minute

Commissioning plan for phase1

1

2017/9/19

Commissioning plan for phase1


Other meetings


Documents

Communication tools


for New members

KAGRA/Commissioning (last edited 2023-09-24 11:11:02 by miyoki)