Differences between revisions 735 and 736
Revision 735 as of 2019-05-21 09:11:48
Size: 19501
Comment:
Revision 736 as of 2019-05-22 09:24:48
Size: 20255
Comment:
Deletions are marked like this. Additions are marked like this.
Line 55: Line 55:
 * 5/17~ increasing ETMY temperature.  * 5/14: RT PC maintenance -> go to safe mode for all VIS connected Dolphin (BS, )
Line 57: Line 57:
 * 5/22: RT PC maintenance -> please go to the safe mode for all VIS connected Dolphin (BS)

 * Xend
 * 6/8: Engineering run

 * ITMX
  * 5/22AM~: tuned off cryostat cooler, finesse measurement for Xarm

 * ETMX
Line 63: Line 66:
 * End of April~: Y arm commissioning
 * ~End of May: Y arm and FPMI commissioning
 * ITMY
  * 5/23AM~: tuned off cryostat cooler, finesse measurement for Yarm
 * ETMY
  * 5/17~: tuned off ETMY cryostat cooler
  * 5/24PM~ inject 100Pa Nitrogen.
  * 5/27 evacuation of Nitrogen.
  * 6/3-6/14: Installation of TMS for ETMY


 * 4/22-5/31: Yarm commissioning
 * 5/27-6/30: DRMI commissioning
 * 7/1-8/9: DRFPMI commissioning
 * 8/12-10/4: DRFPMI ASC
 * 10/7-11/15: Post Commissioning
 * 11/18-12/13: Noise hunting
Line 75: Line 91:
 * COM: Finesse measurement:
  * Yarm 131, ITMY temperature 25K, ETMY temperature 60K
  * Xarm 1151, ITMY temperature 29K, ETMY temperature 126K, but alignment at ETMX
 * COM: It was found that calculation of finesse estimation from ring down measurement was wrong. It was actually Xarm ~1450(close to design value), Yarm ~440(1/3 of design value).
 * Type Bp: Satellite box for PR2 was replaced. One new box was no signal at one of the channels. It was replaced to other new one and it worked.
Line 81: Line 95:
 * VAC: Measurement of height of ETMY by Suzuki-san.  * CRY: ITMX cryostat cooler will be stopped.
 * IOO: MZ will be released today from the main path of PSL.
 * DGS: Maintenance work for adding BIO cards.
 * DGS: Camera server maintenance. If you need camera, please use k1cam1.

KAGRA Commissioning Wiki


Task list


Schedule


Working people assignment

Readiness for the X arm commissioning


Meetings

Daily Meetings (9AM, 1PM)

Zoom URL: https://zoom.us/j/7631499341

Weekly Meetings (Tuesday 11AM)

Zoom URL: https://zoom.us/j/6676627462


Daily meeting

  • Date and time: Every weekday, 9AM
  • First ~10min in the morning meeting, as short as possible
  • Location: Control room and Fan hut connected by eZuce

2019/5/21(Tue.)

Schedule

  • 5/14: RT PC maintenance -> go to safe mode for all VIS connected Dolphin (BS, )

  • 5/20-24: Exchanging cryo valves.
  • 6/8: Engineering run
  • ITMX
    • 5/22AM~: tuned off cryostat cooler, finesse measurement for Xarm
  • ETMX
    • 5/2: Cooling start

    • 5/29: Cooling done
  • ITMY
    • 5/23AM~: tuned off cryostat cooler, finesse measurement for Yarm
  • ETMY
    • 5/17~: tuned off ETMY cryostat cooler
    • 5/24PM~ inject 100Pa Nitrogen.
    • 5/27 evacuation of Nitrogen.
    • 6/3-6/14: Installation of TMS for ETMY
  • 4/22-5/31: Yarm commissioning
  • 5/27-6/30: DRMI commissioning
  • 7/1-8/9: DRFPMI commissioning
  • 8/12-10/4: DRFPMI ASC
  • 10/7-11/15: Post Commissioning
  • 11/18-12/13: Noise hunting

Note

  • There was request to CRY people to attend the morning or noon meeting.
  • CRY: Exchanging cryo valve during this week.

Night work

Weekend

Report of work

  • COM: It was found that calculation of finesse estimation from ring down measurement was wrong. It was actually Xarm ~1450(close to design value), Yarm ~440(1/3 of design value).
  • Type Bp: Satellite box for PR2 was replaced. One new box was no signal at one of the channels. It was replaced to other new one and it worked.

Work plan

  • CRY: ITMX cryostat cooler will be stopped.
  • IOO: MZ will be released today from the main path of PSL.
  • DGS: Maintenance work for adding BIO cards.
  • DGS: Camera server maintenance. If you need camera, please use k1cam1.

KAGRA/Commissioning/DailyWork
<< <  2024 / 4 >  >>
Mon Tue Wed Thu Fri Sat Sun
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30          


Weekly meeting

  • Date and time: Every Tuesday, 11AM
  • Location: Meeting room at Hokubukaikan, or Zoom

No.

Date

Agenda

Schedule

Minute

Files

71

2019/5/21

Agenda

See agenda page

Minute

70

2019/5/14

Agenda

See agenda page

Minute

69

2019/5/7

Agenda

See agenda page

Minute

68

2019/4/23

Agenda

See agenda page

Minute

67

2019/4/16

Agenda

See agenda page

Minute

66

2019/4/9

Agenda

See agenda page

Minute

65-1

2019/4/2

Integrated Type-A meeting

65

2019/4/2

Agenda

See agenda page

Minute

64

2019/3/26

Agenda

See agenda page

Minute

file

63

2019/3/11

Agenda

See agenda page

Minute

62

2019/3/5

Agenda

See agenda page

Minute

61

2019/2/19

Agenda

See agenda page

Minute

60

2019/2/5

Agenda

See agenda page

Minute

59

2019/1/29

Agenda

Minute

58

2019/1/22

Agenda

Minute

57

2019/1/8

Agenda

Minute

56

2018/12/25

Agenda

Minute

55

2018/12/17

Agenda

Minute

54

2018/12/11

Agenda

Minute

53

2018/12/4

Agenda

Minute

52

2018/11/27

Agenda

Minute

51

2018/11/20

Agenda

Minute

50

2018/11/13

Agenda

Minute

49

2018/11/6

Agenda

Minute

48

2018/10/30

Agenda

Minute

47

2018/10/23

Agenda

Minute

46

2018/10/16

Agenda

Minute

45

2018/10/9

Agenda

Schedule

Minute

44

2018/10/2

Agenda

Schedule

Minute

43

2018/9/18

Agenda

Schedule

Minute

42

2018/9/4

Agenda

Schedule

Minute

41

2018/8/28

Agenda

Schedule

Minute

40

2018/8/21

Agenda

Schedule

Minute

39

2018/8/7

Agenda

Schedule

Minute

38

2018/7/31

Agenda

Schedule

Minute

37

2018/7/24

Agenda

Schedule

Minute

36

2018/7/17

Agenda

Schedule

Minute

35

2018/7/3

Agenda

Schedule

Minute

34

2018/6/26

Agenda

Schedule

Minute

33

2018/6/19

Agenda

Schedule

Minute

32

2018/6/12

Agenda

Schedule

Minute

31

2018/6/5

Agenda

Schedule

Minute

30

2018/5/22

Agenda

Schedule

Minute

29

2018/5/8

Agenda

Schedule

Minute

28

2018/5/1

Agenda

Schedule

Minute

27

2018/4/17

Agenda

Schedule

Minute

26

2018/4/10

Agenda

Schedule

Minute

25

2018/4/3

Agenda

Schedule

Minute

24

2018/3/27

Agenda

Schedule

Minute

23

2018/3/20

Agenda

Schedule

Minute

22

2018/3/13

Agenda

Schedule

Minute

21

2018/3/6

Agenda

Schedule

Minute

20

2018/2/27

Agenda

Schedule

Minute

19

2018/2/20

Agenda

Schedule

Minute

18

2018/2/13

Agenda

Schedule

Minute

17

2018/2/6

Agenda

Schedule

Minute

16

2018/1/30

Agenda

Schedule

Minute

15

2018/1/23

Agenda

Schedule

Minute

14

2018/1/16

Agenda

Schedule

Minute

13

2018/1/9

Agenda

Schedule

Minute

12

2017/12/19

Agenda

Schedule

Minute

11

2017/12/12

Agenda

Schedule

Minute

10

2017/11/28

Agenda

Schedule

Minute

9

2017/11/14

Agenda

Schedule

Minute

8

2017/11/7

Agenda

Schedule

Minute

7

2017/10/31

Agenda

Minute

G1707278-v4

6

2017/10/24

Agenda

Minute

G1707278-v3

5

2017/10/17

Agenda

Minute

G1707278-v2
G1707298
G1707300

4

2017/10/10

Minute

G1707278-v1

3

2017/10/3

Agenda

Minute

Commissioning plan for phase1

2

2017/9/26

Agenda

Minute

Commissioning plan for phase1

1

2017/9/19

Commissioning plan for phase1


Other meetings


Documents

Communication tools


for New members

KAGRA/Commissioning (last edited 2023-09-24 11:11:02 by miyoki)