Differences between revisions 17 and 18
Revision 17 as of 2019-07-11 17:26:48
Size: 926
Comment:
Revision 18 as of 2019-07-11 17:27:10
Size: 968
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:
 * worker : Yuzurihara, Tagoshi  * JST: Jul. 13, 2019, 12:00 - 18:00 JST
 * GPS: 1247022018 - 1247043618

Engineering Run 2 (2019/7/13)

  • JST: Jul. 13, 2019, 12:00 - 18:00 JST
  • GPS: 1247022018 - 1247043618

task list

  • data location
    • m31:/data/ll_merged/
  • channel name
    • From ER2 (DetChar)

    • K1:CAL-CS_PROC_MICH_DISPLACEMENT_DQ
    • K1:CAL-CS_PROC_IMC_FREQUENCY_DQ
  • lock flag
    • K1:GRD-LSC_LOCK_OK = 1
  • data quality vector
    • definition

    • We cbc group should check the second bit is 1.
  • code development
    • read the data
    • PSD estimation
  • search
  • how to output the result?
    • histogram of SNR
    • glitch list(GPS, JST, mass, ISCO frequency, duration)

ER2 (DetChar)

KAGRA/DAWG/CBC/ER2 (last edited 2019-08-02 14:46:56 by HirotakaYuzurihara)