Differences between revisions 1 and 6 (spanning 5 versions)
Revision 1 as of 2019-12-09 20:16:15
Size: 109
Editor: miyoki
Comment:
Revision 6 as of 2019-12-09 20:48:43
Size: 625
Editor: miyoki
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:
 1. Most FFU down test for noise investigation in the corner station  * Noise investigation about FFUs in the corner stations
  * Method
   1. Make marks on FFU switches that are not turned off in MCE, IFI, PRM, PR3, PR2, BS, SR2, SR3, SRM, OMC with "Pink Tape".<<BR>>

 ||MCE || IFI || PRM || PR3 || PR2 || BS || SR2 || SR3 || SRM || OMC ||

   * 4 people stand by (MCE, IFI, PRM), (PR3, PR2, BS), (SR2, SR3), (SRM OMC) FFU switchs.
   * Keep taking sensitivity of FPMI condition by an operator.
   * Turn off almost FFUs at the same time by 4 people, except for pink one.
   * Check the difference btw FFU operation and alnost-no operation.

Plans for trial just after ER

  • Noise investigation about FFUs in the corner stations
    • Method
      1. Make marks on FFU switches that are not turned off in MCE, IFI, PRM, PR3, PR2, BS, SR2, SR3, SRM, OMC with "Pink Tape".

    MCE

    IFI

    PRM

    PR3

    PR2

    BS

    SR2

    SR3

    SRM

    OMC

    • 4 people stand by (MCE, IFI, PRM), (PR3, PR2, BS), (SR2, SR3), (SRM OMC) FFU switchs.
    • Keep taking sensitivity of FPMI condition by an operator.
    • Turn off almost FFUs at the same time by 4 people, except for pink one.
    • Check the difference btw FFU operation and alnost-no operation.

KAGRA/EngineeringRun/ER191217_24/postERtrial (last edited 2020-01-05 17:30:32 by tatsuki.washimi)