Differences between revisions 69 and 70
Revision 69 as of 2019-12-10 15:42:16
Size: 3420
Editor: miyoki
Comment:
Revision 70 as of 2019-12-10 15:43:44
Size: 3446
Editor: miyoki
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:
 * '''Noise investigation about FFUs in the corner stations by an operator'''  * &color(blue,#dddddd){'''Noise investigation about FFUs in the corner stations by an operator'''

Plans for trial just after ER

  • &color(blue,#dddddd){Noise investigation about FFUs in the corner stations by an operator}

    1. Preparation
      • Make marks on FFU switches that are not turned off in MCE, IFI, PRM, PR3, PR2, BS, SR2, SR3, SRM, OMC with "Pink Tape".
        (Operated FFU / Total FFU) table list is below.
        130 FFUs will be turned off. This corresponds to 26kW heating power.
        26kW corresponds to about two water cooler cooling power (2 x 14kW). We expect balance.

    Area Name

    MCF

    MCE

    IFI

    PRM

    PR3

    PR2

    BS

    SR2

    SR3

    SRM

    OMC

    Present (151)/Total(180)

    1/16

    2/16

    12/12

    12/12

    16/16

    20/20

    20/20

    20/20

    16/16

    16/16

    16/16

    several FFUs are disorder

    Remained in Test(35)/Total(180)

    1/16

    2/16

    2/12

    2/12

    4/16

    4/20

    4/20

    4/20

    4/16

    4/16

    4/16


  • IEXYV

    IEXYA

    IEXYC(1F)

    IEXYC(2F)

    EXYT

    Present(2)/Total(10)

    Present(2)/Total(10)

    Present(2)/Total(10+1)

    Present(4)/Total(14)

    Present(3)/Total(3)

    <--- KOACH are not included


  • Corner Station (1F)

    180+2x24+ 2x10 + 10(Pre-Rooms) = 258 (~ 51.6kW )


  1. IEXYV

    • Take a sensitivity by an operator.
    • 4 people stand by IEXYV FFU switchs.
    • Turn off remamined two FFUs at the same time.
    • Take the sensitivity again before alignment will change.
    • Turn on two FFUs that used to be turned on.
    • If you see any change in sensitivity, we recheck one by one for IEXYV.
  2. IEXYC(1/2F) and Transmission Area

    • Take a sensitivity by an operator.
    • 4 people stand by IEXYC FFU switchs. 10 are near the KOACH, 14 near the Transmission area.
    • Turn off remained FFUs at the same time.
    • Take the sensitivity again before alignment will change.
    • Turn on FFUs that used to be turned on.
    • If you see any change in sensitivity, we recheck one by one for IEXYC-1F/2F.
  3. IEXYA

    • Take a sensitivity by an operator.
    • 4 people stand by IEXYA FFU switchs.
    • Turn off remained two FFUs at the same time.
    • Take the sensitivity again before alignment will change.
    • Turn on two FFUs that used to be turned on.
    • If you see any change in sensitivity, we recheck one by one for IEXYA.
  4. For Corner station 1F

    1. Method(1)
      • Take a sensitivity by an operator.
      • 5 people stand by (MCE, IFI, PRM), (PR3, PR2, BS), (SR2, SR3), (SRM OMC), and Pre-Room FFU switchs.
      • Turn off almost FFUs at the same time by 4 people, except for pink one.
      • Take the sensitivity again before alignment will change.
      • Check the difference btw FFU operation and almost no FFU operation.

    2. Method(2): If the alignment change is too huge for us to take a sensitivity.
      • We turn off IYC-C and BS-C coolers at the same time when we turn off 130 FFUs.
      • Take sensitivity uegently if possible.
      • Check the temp changes in the corner station.
      • If the temp seems to go down rapidly, we enlarge heating power. If the temp gose up rapidly, we turned on IYC-C again and heat up by heaters.
      • we expect do some try and error for several hours if we encounter serious temp change.
      • If alignment comes back, take sensitivity.
      • If it will take too much time to recover FPMI, we give up this trial.
  • Other items

KAGRA/EngineeringRun/ER191217_24/postERtrial (last edited 2020-01-05 17:30:32 by tatsuki.washimi)