(6)Vacuum system (Kimura/Uchiyama and their selected persons) Vacuum system (Kimura/Uchiyama and their selected persons)


Suspension Condition of IMMT1/2. (Takahashi, Ushiba)


IMMT1/2

  • Mechanical Motion
    • Smooth pico motion and its default position
    • Gaps between magnets and coils
    • Gaps between EQ stoppers and mirrors -> confirmed less than 1mm.

  • Electrical wirings
    • Coil resistances and inductances ->

    • Isolation of Wiring from coils to flanges(pico and mag-coil) ->

    • Fixing on tables is tight and reliable?
  • Smooth Mag-coil motion and balance and TFs
  • Spectrum
  • Mirror conditions(??)
    • Clean around the center?
  • Beam dump(T.Akutsu)
    • Beam shield
    • Beam dumps were additionally added?
      • In basic, No. Relocation was done.


Beam Path from IMC to PRM (Yokozawa, and Akutsu)


STM1/2

  • Mirror mount stability with cables
  • Beam positions on them
  • Trans beam from STM2

IFI to IMMT1

  • IFI injection: No clipping
  • Beam position on IMMT1
  • Trans beam of IMMT1
    • No change to ISS path?
    • ISS beam/CWP reflection beam extracting (??)
    • the beam paths are clear?
    • The beams hit around the center of windows?
    • The reflected beams on the windows are dumped?

IMMT1-IMMT2

  • Beam clearance: no problem
  • Beam position on IMMT2

IMMT2-PRM

  • Main beam/misaligned beam clearances: no problem against the beam dumper
  • The misaligned beam position: hits on the dumper(?) and the temp enhancement was detected.

Around PRM

  • Beam position on PRM
  • IR beam in the midsize baffles(HR/AR side)

Beam Dumper

  • Thermometer works?


Oplev Check for IMMT1. (Yokozawa-kun)


Beam Power

Beam Path Clearance

  • IMMT1

QPD centering

Calibration

PYL Separation(after pumping?)

Spectrum Health

Oplev beam's stray light influence

  • almost no light? as before.

Oplev table covering

  • we will do this after closing.


Vacuum system (Kimura/Uchiyama and their selected persons)


Clean inside as much as possible including bellows duct with TMP

Check the flange seal surface condition where were opened.

  • KF400 flange with a Copper plate-> change with a curved flange.

Decide where the elastomer/Metal gasket will be used.

Logistic to reinstall the bellows duct with TMP.