Differences between revisions 8 and 9
Revision 8 as of 2019-05-08 14:58:52
Size: 4394
Comment:
Revision 9 as of 2019-05-08 14:59:46
Size: 4414
Comment:
Deletions are marked like this. Additions are marked like this.
Line 61: Line 61:
|| 404084241 || Vert || TMS-VISX: Geo-V3|| Akutsu ||
|| 404084242 || Vert || TMS-VISX: Geo-V1|| Fujii -> Akutsu ||
|| 2 || Horiz|| TMS-VISX: Geo-H3|| Akutsu -> Uraguchi ||
|| 404084241 || Vert || -(TMS-VISX: Geo-V3)-|| Akutsu ||
|| 404084242 || Vert || -(TMS-VISX: Geo-V1)-|| Fujii -> Akutsu ||
|| 2 || Horiz|| -(TMS-VISX: Geo-H3)-|| Akutsu -> Uraguchi ||
Line 65: Line 65:
|| 4 || Horiz|| TMS-VISX: Geo-H1|| Akutsu ||
|| 5 || Horiz|| TMS-VISX: Geo-H2|| Akutsu ||
|| 4 || Horiz|| -(TMS-VISX: Geo-H1)-|| Akutsu ||
|| 5 || Horiz|| -(TMS-VISX: Geo-H2)-|| Akutsu ||

TMS-VIS-Y: preparation in Mitaka

  • TMS = BRT (beam reducing telescope) + GPT (Gouy phase telescope)

<< <  2019 / 2 >  >>
Mon Tue Wed Thu Fri Sat Sun
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28      

<< <  2019 / 3 >  >>
Mon Tue Wed Thu Fri Sat Sun
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31

<< <  2019 / 4 >  >>
Mon Tue Wed Thu Fri Sat Sun
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30          

<< <  2019 / 5 >  >>
Mon Tue Wed Thu Fri Sat Sun
    1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31    

<< <  2019 / 6 >  >>
Mon Tue Wed Thu Fri Sat Sun
          1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30

<< <  2019 / 7 >  >>
Mon Tue Wed Thu Fri Sat Sun
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31        

LVDTs

Polarity & Calibration Factor

  • V: postive means that the LVDT outputs positive counts when TMS-VIS moves upward, and so the calibration factors are set.
  • H: postive means that the LVDT outputs positive counts when TMS-VIS moves positive yaw (counter clock wise from top view), and so the calibration factors are set.

Sensor

Serial#

polarity

calibration factor

LVDT V1

#

LVDT V2

#

LVDT V3

#

LVDT H1

#

LVDT H2

#

LVDT H3

#

Actuator coils

Be careful! The pin assignment in the Dsub shell or the signal phases would be different from the below, as I needed to once detach the pins when I installed the coils (Akutsu). Note that newly four actuator coils have been made for TMS-VISY after JGW-T1800846.

Polarity & Calibration Factor

  • V: postive means upward (TMS-VIS moves in upward by inputting positive value to the act coils from MEDM)
  • H: positive means plus yaw (TMS-VIS moves in counter clock wise from top view by inputting positive value to the act coils from MEDM)

Actuator

polarity

Serial#

COIL V1

#

COIL V2

#

COIL V3

#

COIL H1

#

COIL H2

#

COIL H3

#

Geophones

Serical# of L-4C

Vert/Horiz

Naming of the assembled unit

Assembler

404080975

Vert

TMS-VISY: Geo-V2

Akutsu

404080976

Vert

-(TMS-VISX: Geo-V2)-

Akutsu

404080977

Vert

404080978

Vert

TMS-VISY: Geo-V3

Akutsu

404084240

Vert

TMS-VISY: Geo-V1 (broken??)

Akutsu

404084241

Vert

-(TMS-VISX: Geo-V3)-

Akutsu

404084242

Vert

-(TMS-VISX: Geo-V1)-

Fujii -> Akutsu

2

Horiz

-(TMS-VISX: Geo-H3)-

Akutsu -> Uraguchi

3

Horiz

4

Horiz

-(TMS-VISX: Geo-H1)-

Akutsu

5

Horiz

-(TMS-VISX: Geo-H2)-

Akutsu

15

Horiz

TMS-VISY: Geo-H1

Akutsu

16

Horiz

TMS-VISY: Geo-H2

Akutsu

17

Horiz

TMS-VISY: Geo-H3

Akutsu

Cabling

  • LVDT/Act - (coil wires) - Dsub9M - (Dsub9F - PTFE 2m - Dsub9F) - Dsub9M flange - Flipper cable - Dsub Cable
  • Geophone - (MIL C 26482 - PTFE 0.5m - Dsub9M) - (Dsub9F - 1.5m PTFE - Dsub9F) - Dsub9M flange - Flipper cable - Dsub Cable
  • PTFE cables

Task list

KAGRA/Subgroups/AOS/TMS-VIS0-2019 (last edited 2019-05-08 16:15:06 by AyakaShoda)