Line 1: Line 1:
= 20181006 =
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=****]]
= 20181009 =
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6477]]
Line 5: Line 5:
Workers: Akutsu, Michimura, K. Tanaka Workers: Akutsu, Michimura, K. Tanaka (17:30-21:30)
Line 8: Line 8:
 * Installed optics for green path from GBS1, except for green QPD boards (See [[JGW-T1808962|https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=8962]] for optical layout)  * Installed optics for green path from GBS1, except for green QPD boards (See [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=8962|JGW-T1808962]] for optical layout)
Line 10: Line 10:
  * we labeled all the mirror mounts with the part number of the optic
Line 11: Line 12:
  * beam seems to be focused at around GST3, as expected
 * Other things
  * Height of Gig-E camera is a bit short
  * All the LVDT outputs went close to zero from around 21:26. We didn't notice this until we got back to the control room.
Line 13: Line 18:
 * Investigate LVDT outputs
Line 15: Line 21:
 * Install IR optics

20181009

Today's activities

Workers: Akutsu, Michimura, K. Tanaka (17:30-21:30)

GPT part installation

  • Installed optics for green path from GBS1, except for green QPD boards (See JGW-T1808962 for optical layout)

    • we marked screw holes on optical table every 10 holes
    • we labeled all the mirror mounts with the part number of the optic
    • the position of GST2 was 25mm too far from GLNS1, so we moved it to the default position
    • beam seems to be focused at around GST3, as expected
  • Other things
    • Height of Gig-E camera is a bit short
    • All the LVDT outputs went close to zero from around 21:26. We didn't notice this until we got back to the control room.

Next Plan

  • Investigate LVDT outputs
  • Install QPD boards and do the final cabling
  • Check why Gig-E camera is not working
  • Install IR optics

Wanted!

  • M4-12mm (or longer) screws instead of M4-10mm for fixing mirror holders to 20mm dia. posts
  • Spacer for Gig-E camera (height is shorter than 4-inch right now)