Workers: Akutsu, Michimura, K. Tanaka (10:00-21:00) | Workers: Akutsu, Michimura, K. Tanaka (10:30-21:00) |
Line 8: | Line 8: |
[[attachment:TMSX_G.png]] [[attachment:AOS_TMSX_OVERVIEW.png]] [[attachment:AOS_TMSX_GR_QPD.png]] |
* Other things * LVDT driver was not working properly last night because the power cable for SG generating 10kHz calibration line for LVDT was accidentaly unplugged. We taped the cable to the reel. * Height of the BRT output beams to TMSX table was re-adjusted with HBS and GST0, using a laser leveler, so that output beams are parallel to the ground. * Plugged Dsub cables to green QPDs, and roughly centered. It moves a lot. * I was amazed by how well the cabling was done! {{attachment:AOS_TMSX_GR_QPD.png|AOS_TMSX_GR_QPD|width="400" }} * Kokeyama-san and T. Yamamoto-san fixed the network issue and Gig-E camera now works. We renamed the camera from BRTX_G(and BRTX_IR) to TMSX_G(and TMSX_IR). The green beam looks clipping somewhere (output of BRT is already dirty). {{attachment:TMSX_G.png|TMSX_G|width="400" }} * Fixed MEDM screen. {{attachment:AOS_TMSX_OVERVIEW.png|AOS_TMSX_OVERVIEW|width="400" }} * Installed IR periscope. |
20181010
Today's activities
Workers: Akutsu, Michimura, K. Tanaka (10:30-21:00)
GPT part installation
- Other things
- LVDT driver was not working properly last night because the power cable for SG generating 10kHz calibration line for LVDT was accidentaly unplugged. We taped the cable to the reel.
- Height of the BRT output beams to TMSX table was re-adjusted with HBS and GST0, using a laser leveler, so that output beams are parallel to the ground.
- Plugged Dsub cables to green QPDs, and roughly centered. It moves a lot.
- I was amazed by how well the cabling was done!
- Kokeyama-san and T. Yamamoto-san fixed the network issue and Gig-E camera now works. We renamed the camera from BRTX_G(and BRTX_IR) to TMSX_G(and TMSX_IR). The green beam looks clipping somewhere (output of BRT is already dirty).
- Fixed MEDM screen.
- Installed IR periscope.
Next Plan
- Align and balance the BRT and the TMS-VIS.
- Detach the remaining white tapes just before closing the chamber; be noted that there are white tapes on the PEEK connectors at the inside of the flanges.
- Torque completely the bolts which are fixing the upper and the lower base plates.
- Insert metal gaskets before torquing the ICF203 flanges with Dsub connectors.
- Modify MEDM screen
- Add DC PD and so on.
Cable Dsub 15pin for TMS-VIS OpLev.
- Modify cabling for DC PD.
- Return plastic box.
- Install rails in digital rack.
- They may be necessary under LVDT distributor, geophone distributor, and WHT board.
- Nagano is not sure it is necessary under HP coil driver.
- Consider how to cable Dsub cables to QPD.
- Install IR optics