= 20181010 = * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6495]] == Today's activities == Workers: Akutsu, Michimura, K. Tanaka (10:30-21:00) === GPT part installation === * Other things * LVDT driver was not working properly last night because the power cable for SG generating 10kHz calibration line for LVDT was accidentaly unplugged. We taped the cable to the reel. {{attachment:reel.jpg|reel|width="400" }} * Height of the BRT output beams to TMSX table was re-adjusted with HBS and GST0, using a laser leveler, so that output beams are parallel to the ground. * Plugged Dsub cables to green QPDs, and roughly centered (with ceiling LED lights on). Green beam moves a lot. * I was amazed by how well the cabling was done! We could also see the singal with MEDM screens without any problem. * The Dsub cables go under the optical table to QPDs. {{attachment:AOS_TMSX_GR_QPD.png|AOS_TMSX_GR_QPD|width="400" }} * Aligned beam to green DC PD to maximize the signal (~12 counts (~6 counts background with ceiling LED lights on)). * Re-did the cabling of BNC cable around the rack * Kokeyama-san and T. Yamamoto-san fixed the network issue and Gig-E camera now works. We renamed the camera from BRTX_G(and BRTX_IR) to TMSX_G(and TMSX_IR). The green beam looks clipping somewhere (output of BRT is already dirty). * The height of Gig-E camera is also adjusted {{attachment:TMSX_G.png|TMSX_G|width="400" }} * Fixed MEDM screen for camera name change, and added a button for GR_PD. {{attachment:AOS_TMSX_OVERVIEW.png|AOS_TMSX_OVERVIEW|width="400" }} * Installed IR periscope. == Next Plan == * Detach the remaining white tapes just before closing the chamber; be noted that there are white tapes on the PEEK connectors at the inside of the flanges. * Torque completely the bolts which are fixing the upper and the lower base plates. * Insert metal gaskets before torquing the ICF203 flanges with Dsub connectors. * Attach an oplev viewport * Setup the oplev for TMS-VIS * Consider why the green ghost beam is not observed; that was observed in TMSY in this April. * Modify MEDM screen * Add DC PD and so on. * Cable Dsub 15pin for TMS-VIS OpLev. * Return plastic boxes. * Install rails in digital rack. * They may be necessary under LVDT distributor, geophone distributor, and WHT board. * Nagano is not sure it is necessary under HP coil driver. * Consider how to cable Dsub cables to QPD. * Install IR optics * Measure the length between BRT lens3 and GLNS1 == Wanted! == * Black tubes attachable to the DC-PDs or seetabale in front of the DC-QPDs for light shielding. * Screws to screw Dsub 15pin connectors to QPD amplifiers * Nice way to turn off the ceiling LED light * Covers for cables running on the floor * Shield box against environmental light * Wind shielding... (it would be somewhat difficult as two beams are running in the different directions from the viewport window)