= 20181012 = * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6524]] == Today's activities == No tunnel works today. == Next Plan == * Detach the remaining white tapes just before closing the chamber; be noted that there are white tapes on the PEEK connectors at the inside of the flanges. * Torque completely the bolts which are fixing the upper and the lower base plates. * Insert metal gaskets before torquing the ICF203 flanges with Dsub connectors. * Attach an oplev viewport * Setup the oplev for TMS-VIS * Consider why the green ghost beam is not observed; that was observed in TMSY in this April. * Modify MEDM screen * Add DC PD and so on. * Cable Dsub 15pin for TMS-VIS OpLev. * Return plastic boxes. * Install rails in digital rack. * They may be necessary under LVDT distributor, geophone distributor, and WHT board. * Nagano is not sure it is necessary under HP coil driver. * Measure the length between BRT lens3 and GLNS1 == Wanted! == * Black tubes attachable to the DC-PDs or seetabale in front of the DC-QPDs for light shielding. * Screws to screw Dsub 15pin connectors to QPD amplifiers * Already screwed for IR and GR QPDs. Not yet for TMSX VIS oplev. * Nice way to turn off the ceiling LED light * Covers for cables running on the floor * Shield box against environmental light * Wind shielding... (it would be somewhat difficult as two beams are running in the different directions from the viewport window)