Differences between revisions 5 and 6
Revision 5 as of 2020-10-26 19:29:00
Size: 1837
Comment:
Revision 6 as of 2020-11-24 14:37:38
Size: 1851
Comment:
Deletions are marked like this. Additions are marked like this.
Line 4: Line 4:
|| || || ||
||<<MonthCalendar(,2020,10)>>|| || ||
||<<MonthCalendar(,2020,10)>>|| <<MonthCalendar(,2020,11)>>|| ||

Wide Angle Baffle at EYC

<< <  2018 / 8 >  >>
Mon Tue Wed Thu Fri Sat Sun
    1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31    

<< <  2018 / 9 >  >>
Mon Tue Wed Thu Fri Sat Sun
          1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30

<< <  2019 / 2 >  >>
Mon Tue Wed Thu Fri Sat Sun
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28      

<< <  2020 / 10 >  >>
Mon Tue Wed Thu Fri Sat Sun
      1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31  

<< <  2020 / 11 >  >>
Mon Tue Wed Thu Fri Sat Sun
            1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30            

Task list

Note: some of the tasks can be done in parallel.

  • Place/install the WAB suspension

  • Align the position of WAB -> take WAB back to nominal position, put off protectors)

    • horizontal alignment

    • yaw alignment

  • Move it to the saving mode.

  • Back to the nominal position.

  • Attach heat links

    • 4 soft heat links to WAB

    • 1 heat link btwn the top and the structure

  • Attach 2 thermometers

KAGRA/Subgroups/AOS/WideAngleBaffleEY (last edited 2020-11-24 14:37:38 by TomotadaAkutsu)