Wide Angle Baffle at EYC

<< <  2018 / 8 >  >>
Mon Tue Wed Thu Fri Sat Sun
    1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31    

<< <  2018 / 9 >  >>
Mon Tue Wed Thu Fri Sat Sun
          1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30

<< <  2019 / 2 >  >>
Mon Tue Wed Thu Fri Sat Sun
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28      

Task list

Note: some of the tasks can be done in parallel.

  • Place/install the WAB suspension

  • Align the position of WAB -> take WAB back to nominal position, put off protectors)

    • horizontal alignment
    • yaw alignment
  • Move it to the saving mode.
  • Back to the nominal position.
  • Attach heat links
    • 4 soft heat links to WAB
    • 1 heat link btwn the top and the structure
  • Attach 2 thermometers