Differences between revisions 105 and 106
Revision 105 as of 2012-01-24 17:12:37
Size: 2677
Comment:
Revision 106 as of 2012-01-24 18:02:07
Size: 2669
Comment:
Deletions are marked like this. Additions are marked like this.
Line 20: Line 20:
 * [[LCGT/subgroup/AOS/BeamReduceTelescope1|Pick-off and transmit telescopes]]  * [[LCGT/subgroup/AOS/BeamReduceTelescope1|Beam Reducing Telescopes]]

LCGT Auxiliary Optics System (AOS)


Objectives

The objectives of the subgroup "Auxiliary Optics System" (AOS) is to have the other LCGT subgroups design and complete the auxiliary optics that physically, logically and consistently glue the main parts of the LCGT interferometer together.

General Description

Most of the AOS shall be fit to the vacuum chambers that had been already determined when the AOS group was established. Even if the vacuum chamber was not designed considering the space allocated for AOS, AOS are required for fully operating LCGT, so we shall, by any means, pack them into the vacuum chambers if required.

References

Aux. opt. list from MIF's point of view

Layout Meeting

Optical Parameters

Parameter Meeting

LCGT SVN

Terminology

Discussion with Rana 2010

Subsystems

Meetings

KAGRA/Subgroups/AOS (last edited 2019-04-11 15:18:56 by TomotadaAkutsu)