Differences between revisions 63 and 64
Revision 63 as of 2011-08-29 04:28:37
Size: 2294
Comment:
Revision 64 as of 2011-08-29 06:01:34
Size: 2356
Comment:
Deletions are marked like this. Additions are marked like this.
Line 19: Line 19:
 * [[LCGT/subgroup/AOS/BeamReduceTelescope1|Transmit Telescopes (transmit IR/Green beams)]]  * [[LCGT/subgroup/AOS/BeamReduceTelescope1|IR Pick-off and transmit telescopes]]
 * [[LCGT/subgroup/AOS/BeamReduceTelescope2|Green
Transmit Telescopes]]
Line 22: Line 23:
 * [[LCGT/subgroup/AOS/InitialAlign1|Initial Alignment Setting]]  * [[LCGT/subgroup/AOS/InitialAlign1|Initial Alignment System]]

LCGT Auxiliary Optics Subsystem (AOS)


Objectives

The objectives of the subgroup "Auxiliary Optics System" (AOS) is to have the other LCGT subgroups design and complete the auxiliary optics that physically, logically and consistently glue the main parts of the LCGT interferometer together.

General Description

All the AOS shall be fit to the vacuum chambers that had been already determined when the AOS group was established. Even if the vacuum chamber was not designed for considering the space allocated for AOS, AOS are required for fully operating LCGT, so we should pack them into the vacuum chambers BY ANY MEANS.

References

Aux. opt. list from MIF's point of view

Layout Meeting

Optical Parameters

Parameter Meeting

LCGT SVN

Terminology

Discussion with Rana 2010

Subsystems

Meetings

KAGRA/Subgroups/AOS (last edited 2019-04-11 15:18:56 by TomotadaAkutsu)