Differences between revisions 1 and 5 (spanning 4 versions)
Revision 1 as of 2019-01-28 18:36:57
Size: 293
Editor: YukiInoue
Comment:
Revision 5 as of 2019-03-05 23:20:03
Size: 500
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
= 2019/01/07 18:00 = = 2019/01/28 18:00 =
Line 5: Line 5:
 * Brief summary of current progress for low latency reconstruction (Darkhan; 10min)
 * Results of Pcal Noise measurement (Bill; 10min)
 * Brief summary of current progress for low latency reconstruction (Darkhan; 10min) [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=9927|notes]]
 * Results of Pcal Noise measurement (Bill; 10min) [[https://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0098/G1909830/001/20190128_Bill_Results_of_Pcal_Noise_measurement.pdf|slide]]

2019/01/28 18:00

Agenda

  • Schedule and Plans for finalization of Pcal (Yuki; 20 min)
  • Plans of iMC/DR reconstruction (Y.Takahiro; 10min)
  • Brief summary of current progress for low latency reconstruction (Darkhan; 10min) notes

  • Results of Pcal Noise measurement (Bill; 10min) slide

KAGRA/Subgroups/CAL/CAL_Meeting/20180128 (last edited 2019-03-05 23:20:03 by darkhan.tuyenbayev)