= 2019/02/25 18:30 = == Agenda == * Schedule: Yuki * Realtime model for DRMI commissioning: Yamammmoto * Pcal finalization (Y-end result): Yuki * Progress of measurement for DARM model: Cory [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=9865|slide]] * CAL-Git: Wu-Cheng [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=9864&fbclid=IwAR0gHQ6RS6gfGXnBR31BwC0LXl8k89YCQIs6tH-VesTpSMP_8SuviqDOTAw|slide]] ----- === Realtime model for DRMI commissioning === * Requests from commissioning team * Calibrated signals of MICH, PRCL, and SRCL. * 10-20% error for each DOF * ASAP after DRMI will be locked. * Current status of RT model. * Filter processes of MICH, PRCL, and SRCL are constructed. * dL = C^-1^ * v,,e,, + (A,,TM,, + A,,IM,,) * v,,c,, || '''variable''' || '''channel name''' || || dL || K1:CAL-CS_PROC_$(DOF)_DISPLACEMENT || || C^-1^ * v,,e,, || K1:CAL-CS_PROC_$(DOF)_RESIDULA || || (A,,TM,, + A,,IM,,) * v,,c,, || K1:CAL-CS_PROC_$(DOF)_DELTA_CTRL || || v,,e,, || K1:CAL-CS_PROC_$(DOF)_ERR || || v,,c,, || K1:CAL-CS_PROC_$(DOF)_CTRL || * Channels are not registered to DAQ yet. * There are no CAL line to PRM and SRM. * Is there any plan of low-latency/offline reconstruction? -> Darkhan and Sawada-san. * Gain drifts by time are not taken into account. * What we need. * Optical gain (and cav. pole of PRC and SRC). * Actuator efficiencies of TM and IM of BS, PRM, and SRM. * Maybe the approximations as f^-2^ and f^-4^ are enough for 10-20% error.