Differences between revisions 1 and 6 (spanning 5 versions)
Revision 1 as of 2019-04-08 21:13:04
Size: 93
Comment:
Revision 6 as of 2019-04-15 13:25:15
Size: 464
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
KAGRA/Subgroups/CAL/CAL_Meeting/20180408について、ここに記述してください。 = 2019/04/08 =
18:30 JST (Japan) 17:30 CST (Taiwan) 10:30 CET (Geneva)

 * Darkhan: Review of low latency pipeline [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10041|JGW-G1910041]]
 * Tomigami: Progress of Camera analysis [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10042|JGW-G1910042]]
 * Sawada:Plans of injection test in engineering run.
 * Y.Takahiro: Quick report of CAL CS down problrm

2019/04/08

18:30 JST (Japan) 17:30 CST (Taiwan) 10:30 CET (Geneva)

  • Darkhan: Review of low latency pipeline JGW-G1910041

  • Tomigami: Progress of Camera analysis JGW-G1910042

  • Sawada:Plans of injection test in engineering run.

  • Y.Takahiro: Quick report of CAL CS down problrm

KAGRA/Subgroups/CAL/CAL_Meeting/20180408 (last edited 2019-04-15 13:25:15 by yuki.tomigami)