Differences between revisions 2 and 3
Revision 2 as of 2019-04-08 21:13:57
Size: 76
Comment:
Revision 3 as of 2019-04-09 16:00:44
Size: 271
Editor: YukiInoue
Comment:
Deletions are marked like this. Additions are marked like this.
Line 5: Line 5:

 * Darkhan: Review of low latency pipeline
 * Tomigami: Progress of Camera analysis
 * Sawada:Plans of injection test in engineering run.
 * Y.Takahiro: Quick report of CAL CS down problrm

2019/04/08

18:30 JST (Japan) 17:30 CST (Taiwan) 10:30 CET (Geneva)

  • Darkhan: Review of low latency pipeline
  • Tomigami: Progress of Camera analysis
  • Sawada:Plans of injection test in engineering run.

  • Y.Takahiro: Quick report of CAL CS down problrm

KAGRA/Subgroups/CAL/CAL_Meeting/20180408 (last edited 2019-04-15 13:25:15 by yuki.tomigami)