Differences between revisions 1 and 2
Revision 1 as of 2020-02-19 18:02:23
Size: 352
Editor: YukiInoue
Comment:
Revision 2 as of 2020-02-19 18:04:42
Size: 352
Editor: YukiInoue
Comment:
Deletions are marked like this. Additions are marked like this.
Line 8: Line 8:
 * Result of sine measurement (Inoue: 5min)  * Result of sign measurement (Inoue: 5min)

2020/2/19

18:00 JST (Japan) 17:00 CST (Taiwan) 10:00 CET (Geneva)

  • Schedule of CAL day(Inoue: 15min)
  • Plan of free swinging Michelson(Yamamoto:10min)

  • CAL review (Inoue: 10min)
  • Preparation of Low latency(Darkhan or Sawada: 10min)
  • Pcal parameters (Ko-Han; 15min)
  • Result of sign measurement (Inoue: 5min)
  • calibration shift

KAGRA/Subgroups/CAL/CAL_Meeting/20200219 (last edited 2020-02-19 20:28:58 by YukiInoue)