Differences between revisions 1 and 2
Revision 1 as of 2020-04-06 17:56:19
Size: 225
Editor: YukiInoue
Comment:
Revision 2 as of 2020-04-06 20:03:41
Size: 408
Editor: YukiInoue
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:
  * CAL review: April 8 at 5:00 UTC
Line 6: Line 7:
    * Check the phase shift at 960Hz and 961Hz. -> Consistency check (Requirement: Measurement.13; Tuday)
    * Sine gauss measurement (Today)

2020/03/30

  • Agenda
    • CAL review: April 8 at 5:00 UTC
    • Measurement summary in Kamioka: Y.Takahiro
    • Low latency output (kappa, C10 and C00 comparison): S.Takahiro
    • Duotone injection: Yuki
      • Check the phase shift at 960Hz and 961Hz. -> Consistency check (Requirement: Measurement.13; Tuday)

      • Sine gauss measurement (Today)
    • Summary of daily calibration measurements: Yuki

KAGRA/Subgroups/CAL/CAL_Meeting/20200406 (last edited 2020-04-13 15:51:18 by YukiInoue)