= 2020/04/06 = * Agenda * CAL review: April 8 at 5:00 UTC * Measurement summary in Kamioka: Y.Takahiro * Low latency output (kappa, C10 and C00 comparison): S.Takahiro * Duotone injection: Yuki * Check the phase shift at 960Hz and 961Hz. -> Consistency check (Requirement: Measurement.13; Tuday) * Sine gauss measurement (Today) * Summary of daily calibration measurements: Yuki