Differences between revisions 1 and 2
Revision 1 as of 2017-03-21 11:13:04
Size: 1433
Comment:
Revision 2 as of 2017-03-21 11:13:19
Size: 781
Comment:
Deletions are marked like this. Additions are marked like this.
Line 14: Line 14:
 * Pcal/camera developments (Inoue) [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=6051|slides]]
   * YI will go to LIGO Hanford to finalize the Pcal design and have a review (end of Feb. ~ beginning of March)
   * Prototype setup of Pcal and camera is made at KEK
   * The detailed schedule was already submitted to SEO and in general approved (a few adjustments needed with other subsystems)
   * 20w fiber LASER was already ordered
   * Transmitter/Receiver modules will be ordered in the next fiscal year
   * To do things by June
    * Camera window, Holes position, Weight scale, Wide-range mirror, In-vacuum stage
 *

CAL Meeting on 2017/3/21 9:30 at Osaka City University

Participants : CAL member + DAS/theory

Agenda

  • 9:30 Overview and schedule (S. Haino) slides

  • 10:30 Development of photon calibrator (Y. Inoue + Shishido) slides

  • 11:30 Calibration of bKAGRA and calibration lines (T. Yamamoto) slides

  • 13:30 Basics of interferometer and calibration (Y. Michimura)
  • 14:30 Calibration and science of Gravitational Wave (N. Kanda)
  • 15:30 Injection test (T. Yokozawa)
  • 16:30 Discussions

Minutes

KAGRA/Subgroups/CAL/Meeting/170321 (last edited 2017-03-21 15:38:39 by SadakazuHaino)