== CAL Meeting on 2017/5/10 17:00- == Participants : B.H.Hsieh, Y.Inoue, N.Kanda, T.Shishido, T.Tomaru, T.Yamamoto, T.Yokozawa, SH === Minutes === * Pcal development - [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=6711|Inoue]] * Yokozawa-san and Binhua will arrange their schedule in Kamioka to join the Tcam installation work. * Yuki made a performance test of 20W laser and found a noise peak at 1952 Hz. We will ask to the company if they can shift this peak to higher frequency. * 20W laser is sampled and attenuated to be measured by a power meter in mW range, but eventually we can use the Working Standard (Integrating Sphere +PD) to measure the absolute power. * "The possible 1-week delay of the schedule" is not actually the delay (by Tomaru-san) but anyway it is independent of Tcam installation work. * Now we have WSK (KAGRA Working Standard) at LHO and LIGO Pcal group is helping us to make a periodic measurements w.r.t. LIGO Gold Standard (GS) to check the stability. Soon they will ship the WSK to KEK and we can use it as an absolute power reference. * iKAGRA calibration - [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=6712|Yamamoto]] * Yokozawa-san commented that the time delay of ADC/DAC may be different. For bKAGRA calibration we need to measure the time delay of ADC/DAC after we install the final place. * SH commented that we should better present in DAS meeting about the current study of iKAGRA h(t) re-generation and ask for what they want. * Kanda-san commented that it is interesting to compare the results between current h(t) and new h(t) after correcting for the possible time variation particularly on the non-Gaussianity and noise floor. * Hardware injection - [[attachment:cal_yokozawa_170510.pdf|Yokozawa]] * Yokozawa-san is waiting for the update of Type-A and CRY payload transfer function, but he can start to use the currently available one by Yuki, Okutomi-san and Miyamoto-san. * JPS presentation is discussed later. * Tcam development - Shishido * The currently shown photo of the target marker doesn't look good but he will use the original photo instead of the compressed one. * Kanda-san suggested to use the grid paper (ho-gan-shi) to check the deformation but Shishido-san already did it and he will also show the photo. * He will give a talk in KIW3 as his "debut" talk so he will improve the slides and make more practice. * AOB * Yuki submitted an abstract of "KAGRA calibration" to GWPAW after discussing with Yamamoto-san and SH, and now it is accepted as an oral presentation. We plan to have a meeting with Virgo CAL team together with Yuki, Kanda-san, Yokozawa-san, SH in Annecy because Annecy is the home institute of Virgo CAL group. * Current list of JPS talks on CAL * T.Yokozawa - CAL status talk and Hardware Injection * T.Yamamoto - iKAGRA calibration and/or evaluation of online h(t) * Y.Inoue - Pcal development * T.Shishido - Tcam development and ETM image during the huging test * B.H.Hsieh - Two optical follower servo development (for Pcal transmitter) * SEO approved all the budget request from CAL but they also asked us to use other fundings if possible. Tomaru-san won Kiban-A so we will decide how to distribute budgets (mostly for Pcal hardware).