Differences between revisions 5 and 6
Revision 5 as of 2019-05-30 12:33:07
Size: 1283
Comment:
Revision 6 as of 2019-06-19 00:35:47
Size: 1283
Comment:
Deletions are marked like this. Additions are marked like this.
Line 5: Line 5:
||1 ||Gritch trigger generation for main IFO signal ||< || ||
||2 ||Glitch visualization for main IFO signal ||< || ||
||1 ||Gritch trigger generation for main IFO signal ||o || ||
||2 ||Glitch visualization for main IFO signal ||o || ||
Line 9: Line 9:
||5 ||Line visualization for main IFO signal ||< || || ||5 ||Line visualization for main IFO signal ||o || ||
Line 12: Line 12:
||8 ||Providing online data quality flag ||< || || ||8 ||Providing online data quality flag ||o || ||

Contents

  1. Task list
    1. O3 run

Task list

O3 run

#

Item

ER 6/8

ER 6/xx

1

Gritch trigger generation for main IFO signal

o

2

Glitch visualization for main IFO signal

o

3

Coincidence search with environmental channels

4

Preparing Glitch database

5

Line visualization for main IFO signal

o

6

Investigating peak frequency and source of noise

<

7

Preparing Line database

8

Providing online data quality flag

o

9

Providing data quality category

10

Merging data quality category with proc. data

11

Providing data quality report (DQR)

12

Sharing DQR with LV

13

Preparing daily(?) check items

14

Preparing a manual of DetChar tools

15

Preparing a trouble shooting manual

KAGRA/Subgroups/DET/Task/O3 (last edited 2019-07-02 21:52:45 by TakahiroYamamoto)