= LIGO-KAGRA CDS meeting - 6/21 8am (JST), 6/20 6pm (LLO) = == Connection Info == [[KAGRA/Subgroups/DGS/Meeting/LKAccess|Teamspeak]] (password protected page. KAGRA wiki account is necessary to view.) ---- == Participants == Osamu, Takahiro, Keiko, Oshinosan, Keith, Rolf ---- == Agenda == * Report on IRIG-B issue and CPU max * presentation file is [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=9017|here]]. * Report on k1bcst0 * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=9018|viewgraph]]. * KAGRA's DMT and DQ Flags * LIGO's svn? ---- == Minutes == == CPU max == * epics channels to store => DAQ flow * general epics channel => normal TCP/IP flow * RCG 3.1 improves the double traffic * Also slower than 3GHz CPU is not good * slot of PCIE card - one stop card matters * when we put a interface card of the raiser card to closer to mother board card was not good - LIGO: it shouldn't matter * Priority of riser cards may be necessary (not much related to the current cpu issue) * epics gateway (machine) may be necessary to collect the epics information and reduce the redundant traffic == broadcaster == * dedicated network from bcst low latency * not same swich from the control room client machiens' * 1Gb switch is fine * not all chans are sent to dmt == svn == * svn web interface changed * freeze the svn at RCG 3.5 for O3 and move to git * svn version is updated - Keith will send the info